Set project status
set_project_statusChange a project's status to idea, active, paused, done, or dropped. Marks the completion date when set to done.
Instructions
Change a project's status (idea/active/paused/done/dropped). 'done' stamps a completion date.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"ref": "<ref>",
"status": "<status>"
},
"name": "set_project_status"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| ref | Yes | Project path or title | |
| status | Yes |