dm_promote
Promotes a recorded decision point between collect, shadow, serve, and paused phases, requiring checks and confirmation before live serving.
Instructions
Move a point: {point_id*, phase* (collect|shadow|serve|paused), [confirm]}. shadow needs a trained probe (local_legacy) or the hosted key + a budget + remote_ok (tiered, no training); serve needs all §6.4 checks plus confirm:true (ask the user first). With plan_phase, moves plan phases (§15.6); with workflow + downgrade, enables downgrade after a passed trial (§15.8).
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| payload | Yes |
Output Schema
| Name | Required | Description | Default |
|---|---|---|---|
| result | Yes |