IAS 37: Onerous contracts: least net cost of exiting (66-69)
ias37_onerous_contractTests whether a contract is onerous by comparing unavoidable exit or fulfilment costs with expected economic benefits, applying IAS 37 rules for provisions.
Instructions
Tests whether a contract is onerous by comparing the unavoidable costs with the expected economic benefits. Unavoidable costs are the least net cost of exiting: the lower of the cost of fulfilling the contract (incremental costs plus an allocation of other costs that relate directly to fulfilling contracts, 68A) and any compensation or penalties for failing to fulfil it. Impairment of assets dedicated to the contract is recognised first (69).
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"expectedBenefits": "<expectedBenefits>",
"incrementalCosts": "<incrementalCosts>"
},
"name": "ias37_onerous_contract"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| contract | No | Contract | Contract |
| expectedBenefits | Yes | Economic benefits still expected under the contract [IAS 37.10, IAS 37.67] | |
| incrementalCosts | Yes | Incremental costs of fulfilling (direct labour, materials) [IAS 37.68A] | |
| allocatedDirectCosts | No | Allocation of other costs relating directly to fulfilling (e.g. depreciation of equipment used) [IAS 37.68A] | |
| dedicatedAssetsImpairment | No | Impairment recognised first on assets dedicated to the contract [IAS 37.69] | |
| exitCompensationOrPenalty | No | Compensation or penalty to exit the contract (0 = cannot exit) [IAS 37.68] |