Skip to main content
Glama
IFRS Year-End Close Agent

IFRS Year-End Close Agent

by jabran

IAS 37: Onerous contracts: least net cost of exiting (66-69)

ias37_onerous_contract
Read-onlyIdempotent

Tests whether a contract is onerous by comparing unavoidable exit or fulfilment costs with expected economic benefits, applying IAS 37 rules for provisions.

Instructions

Tests whether a contract is onerous by comparing the unavoidable costs with the expected economic benefits. Unavoidable costs are the least net cost of exiting: the lower of the cost of fulfilling the contract (incremental costs plus an allocation of other costs that relate directly to fulfilling contracts, 68A) and any compensation or penalties for failing to fulfil it. Impairment of assets dedicated to the contract is recognised first (69).

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "expectedBenefits": "<expectedBenefits>",
      "incrementalCosts": "<incrementalCosts>"
    },
    "name": "ias37_onerous_contract"
  }
}

Input Schema

NameRequiredDescriptionDefault
contractNoContractContract
expectedBenefitsYesEconomic benefits still expected under the contract [IAS 37.10, IAS 37.67]
incrementalCostsYesIncremental costs of fulfilling (direct labour, materials) [IAS 37.68A]
allocatedDirectCostsNoAllocation of other costs relating directly to fulfilling (e.g. depreciation of equipment used) [IAS 37.68A]
dedicatedAssetsImpairmentNoImpairment recognised first on assets dedicated to the contract [IAS 37.69]
exitCompensationOrPenaltyNoCompensation or penalty to exit the contract (0 = cannot exit) [IAS 37.68]

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observedv1.0.0

TDQS

Score is being calculated.