Resume rollout
resume_rolloutResumes a halted Google Play staged rollout at a required percentage, validating changes or requiring production confirmation before applying them.
Instructions
Resumes a halted rollout at the percentage you give (required — the previous percentage is not assumed). On production this requires confirm_production: true, otherwise it is a dry run.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| track | Yes | Track: internal, alpha, beta, production, or a custom/form-factor track (e.g. wear:production). | |
| package_name | No | Android package name. Defaults to PLAY_MCP_PACKAGE. | |
| validate_only | No | Dry run: validate the change in an edit, then discard it. | |
| confirm_production | No | Must be true to change a production track. Without it the call runs as a dry run and returns a preview. | |
| rollout_percentage | Yes | Percentage to resume at, e.g. 20. | |
| changes_not_sent_for_review | No | Managed publishing: commit without sending for review. |