move_work_item
Move a work item to a different section, optionally placing it before a specified work item, to reorganize TestIT project boards.
Instructions
Move a work item to another section (optionally before nextWorkItemId).
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"id": "<id>",
"sectionId": "<sectionId>"
},
"name": "move_work_item"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| id | Yes | Work item UUID. | |
| sectionId | Yes | Target section UUID (see list_sections). | |
| nextWorkItemId | No | Place before this work item (optional). |