Skip to main content
Glama

Related Servers

Alternatives to fagan

No user-submitted related servers found.

    Related Servers

    • A
      license
      A
      quality
      B
      maintenance
      Local code review for people and their coding agents: an agent opens a review of its changes and hands over a link, the person comments on lines, and the agent reads the threads, replies and resolves what it fixed. Reads the git worktree directly, uncommitted work included; nothing leaves the machine.
      17
      127
      GPL 3.0
    • A
      license
      Not graded
      quality
      D
      maintenance
      A local-first, auditable code review MCP server that freezes Git changes, creates immutable ReviewBundles, provides role-isolated contexts for correctness, security, architecture, and test reviewers, validates structured findings, and generates deterministic JSON/Markdown reports.
      5 npm
      1
      Apache 2.0
    • A
      license
      Not graded
      quality
      B
      maintenance
      Enables coding agents to run deterministic completeness audits on code before declaring 'done'—catching unwired modules, placebo tests, swallowed errors, and stubs via AST analysis, entirely offline and free.
      MIT
    • A
      license
      Not graded
      quality
      B
      maintenance
      Enables coding agents to store and recall durable, confidence-graded project facts, trace a file's blast radius across the code graph before editing, pack a token-budgeted context brief, and run a verification gate that can only record passes it actually observed. Runs locally over stdio with no model calls or network access.
      2
      MIT
    • A
      license
      Not graded
      quality
      B
      maintenance
      Enforces a git-tracked, code-checked finite state machine that hands control between a planning director and a local Ollama implementor, exposing tools to check phase status, transition states, and run the implementor to execute plan step files one at a time. It enables a project to be planned, implemented step by step with per-step test gating, and validated before completion.
      2
      MIT