variance_report
Generate budget-vs-actual reports with revenue bridges, flagged lines, first-pass commentary, and data checks so you can decide if a period is ready to send.
Instructions
Budget vs actual by line with a volume/rate revenue bridge, lines flagged for review, first-pass commentary, and the data checks for the period.
A line is flagged when |variance| is at least threshold_pct of budget AND at least threshold_abs dollars. The report's status tells you whether it can go out.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"level": "<level>",
"period": "<period>"
},
"name": "variance_report"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| ytd | No | ||
| name | No | ||
| level | Yes | ||
| period | Yes | ||
| threshold_abs | No | ||
| threshold_pct | No |