Skip to main content
Glama
SprutMonitor MCP Server

SprutMonitor MCP Server

Official
by extralabs

Chronometry

get_chrono
Read-only

Fetch paginated chronometry timeline entries filtered by period, date range, user, group, or filter key for employee work-time analysis.

Instructions

Chronometry timeline (POST /api/Chrono/Overall2).

Tool call template

This tool declares no required parameters. Add optional parameters from the input schema as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {},
    "name": "get_chrono"
  }
}

Input Schema

NameRequiredDescriptionDefault
limitNoMax rows to return (1–500).
offsetNoPagination offset (0-based).
periodNoRelative period: today|yesterday|last_7_days|last_30_days (wins over date_from/date_to when set).
compactNo
date_toNoEnd datetime; date-only covers until 23:59:59 that day.
user_idNoUser filter: Items.ID where Type=2 (reports call it AliasID). NodeType=1.
group_idNoGroup filter: TreeviewUsers NodeType=14 (console group id).
date_fromNoStart datetime YYYY-MM-DD or YYYY-MM-DD HH:MM:SS (full day if date-only).
filter_keyNoOptional text filter passed to the Cloud API FilterKey.

Output Schema

NameRequiredDescriptionDefault

No arguments

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observedv0.5.1

TDQS

C2.2/5.0
Behavior2/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already declare readOnlyHint=true and openWorldHint=true, so the safety profile is covered. The description adds nothing beyond that: it does not say what the timeline contains, whether results are paginated in practice, how compact mode changes output, or how heavy the query is against the Cloud API.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness2/5

Is the description appropriately sized, front-loaded, and free of redundancy?

It is short, but short because it is under-specified rather than economical. A single ambiguous fragment plus a raw endpoint path does not front-load any actionable information for an agent.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness2/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

With 9 optional parameters, an open-world flag, and a sibling family of reporting tools, this definition is far too thin. The output schema means return values need not be explained, but the description never establishes what the chronometry timeline is or when to pick it over the other summary/timesheet tools.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema description coverage is 89%, so parameters are largely self-documenting and the baseline of 3 applies. The description contributes no additional semantics, and the one parameter with no schema description (compact) is left unexplained in both places.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose2/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description is essentially 'Chronometry timeline' plus a backend endpoint path. 'Chronometry' merely restates the tool title and 'timeline' is the only distinctive noun, so an agent cannot tell what data this returns or how it differs from get_timesheet, get_day_structure, or get_activity_summary.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines2/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

There is no when-to-use guidance whatsoever: no mention of the alternative timeline/report tools, no prerequisites, and no statement of which questions this tool answers. The endpoint reference gives implementation detail, not selection guidance.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.