Skip to main content
Glama

Move Notes to Another Project

brain_update_project

Move all notes from one project to another or clear their project assignment. Preview the affected note count with a dry run before applying the change.

Instructions

Move every note from one project to another (or to no project). Use dry_run to see how many would move first.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "from_project": "<from_project>",
      "to_project": "<to_project>"
    },
    "name": "brain_update_project"
  }
}

Input Schema

NameRequiredDescriptionDefault
dry_runNoIf true, only report how many notes would move.
to_projectYesProject to move to. null clears the project.
from_projectYesProject to move from. null matches notes with no project.

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observedv0.1.0

TDQS

A3.6/5.0
Behavior3/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

With no annotations, the description carries the full burden. It does disclose the important behavioral trait that this is a bulk mutation of all notes in a project and that dry_run provides a count-only preview — genuinely useful safety context. However, it omits reversibility, whether existing project assignments are overwritten, and failure behavior when the source project doesn't exist or has no notes.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness5/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Two short sentences, zero waste, with the bulk-scope constraint front-loaded and the dry-run tip immediately after. Nothing is buried or redundant.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

For a simple three-parameter bulk-move tool with a fully documented schema and no output schema, the description covers scope, the null-target case, and the dry-run preview. Only the outcome/error behavior of an actual move is left unstated, a modest gap given the tool's simplicity.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema description coverage is 100%, including the null semantics for both from_project and to_project, so the schema already carries the parameter meaning. The description only reinforces the dry_run preview role, adding little beyond the structured fields. Baseline 3 is appropriate.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

Names a specific verb and resource: move every note from one project to another (or to no project). The bulk scope ('every note') is explicit, which distinguishes it from a single-note edit. It doesn't explicitly contrast with siblings like brain_delete, but the operation is unambiguous on its own.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines3/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

The only usage guidance is 'Use dry_run to see how many would move first,' which is a useful preview recommendation but not a when-to-use/when-not-to-use rule. Nothing tells the agent under what circumstances this bulk move is appropriate versus, say, deleting or re-saving notes, nor are prerequisites or irreversibility warnings given.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.