Skip to main content
Glama
Things 3 MCP Server
by ebowman

update_project

Modify an existing project by updating only the fields you specify, including title, notes, tags, schedule, area, deadline, and completed or canceled status. Omit fields to keep current values.

Instructions

Update an existing project. Supports partial updates to any field including status, scheduling, tags, and content.

Status semantics for completed/canceled (identical across update_todo, bulk_update_todos, and update_project - see CLAUDE.md for the full 3x3 table): canceled='true' always wins regardless of completed (e.g. completed='false', canceled='true' results in canceled). Whenever canceled is not 'true', completed (if given) decides the result: 'true' -> completed, 'false' -> open. canceled='false' alone (with completed omitted) also reopens the project - this is NOT a no-op. Omitting both leaves status unchanged. completed/canceled only accept the strings 'true'/'false' (case-insensitive) - any other value (e.g. 'yes', '1') is rejected with a structured VALIDATION_ERROR rather than being silently coerced to False.

Clear-field semantics for partial updates: a field left at its default (None/omitted) leaves the existing value unchanged. Passing notes='' or deadline='' clears that field. Passing tags='' clears all tags. title='' is rejected with a validation error (titles cannot be cleared). when='' is also rejected - use when='anytime' or when='someday' to unschedule instead.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "id": "<id>"
    },
    "name": "update_project"
  }
}

Input Schema

NameRequiredDescriptionDefault
idYesID of the project to update
tagsNoComma-separated new tags (replaces existing tags). Omit to leave unchanged; pass '' to clear all tags
whenNoSchedule date/time: 'today', 'tomorrow', 'someday', 'anytime', or a date (e.g., '2024-12-25@14:30'). 'evening'/'tonight' is not supported for projects - Things has no This Evening concept for projects. Omit to leave unchanged; '' is rejected - use 'anytime' or 'someday' to unschedule
notesNoNew notes. Omit to leave unchanged; pass '' to clear existing notes
titleNoNew title. Omit to leave unchanged; '' is rejected (titles cannot be cleared)
area_idNoID of area to move to
canceledNoMark as canceled (true/false)
deadlineNoNew deadline. Must be YYYY-MM-DD - relative keywords like 'today' are rejected. Omit to leave unchanged; pass '' to clear the existing deadline
completedNoMark as completed (true/false)
area_titleNoTitle of area to move to

Output Schema

NameRequiredDescriptionDefault

No arguments

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observedv0.1.0

TDQS

A4/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

With no annotations, the description carries the full behavioral burden and does so well: it discloses validation behavior (only 'true'/'false' accepted, other values raise a structured VALIDATION_ERROR rather than being coerced), which fields can be cleared with '' and which are rejected (title, when), and that omitted fields are left unchanged. Gaps remain — nothing about permissions, reversibility, idempotency, or what happens when the id does not exist — and it defers part of the rule set to an external CLAUDE.md the agent may not be able to read.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Structure is strong — a one-line purpose statement first, then clearly separated status and clear-field rules, each labeled. It is long and partially duplicates what the 100%-covered schema already says about omit-vs-empty-string for notes, deadline, and tags, so some sentences are not earning their place.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

For a 10-parameter mutation tool with no annotations, the description covers the highest-risk areas well: status transitions, partial-update clearing, and validation rejection. An output schema already exists so return values need no explanation; the remaining holes are the area_id/area_title conflict and failure behavior for a nonexistent id.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters4/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100%, so the baseline is 3; the description earns above that by describing cross-parameter behavior the schema cannot express, notably that canceled='true' overrides completed and that canceled='false' with completed omitted actively reopens the record. It does not address the one genuine ambiguity in the schema: area_id and area_title are both accepted, and precedence when both are supplied is unstated.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description opens with a specific verb and resource ("Update an existing project") and enumerates the field families it touches (status, scheduling, tags, content). It references update_todo and bulk_update_todos, but only to point at shared status semantics rather than to explain why an agent would pick this tool over them; the project-vs-todo distinction is left implicit.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines4/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

It gives unusually concrete conditional guidance: the precedence of canceled over completed, the fact that canceled='false' alone reopens a project and is NOT a no-op, and that omitting both leaves status unchanged. What's missing is routing guidance — it never states when to reach for bulk_update_todos or add_project instead, nor any prerequisite such as the project existing.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.