complete
Mark an initiative (ticket/issue) as done and close it, requiring updated doc paths or a none reason, then report newly ready initiatives and reached milestones.
Instructions
Mark an initiative (ticket/issue) done — "close" it. docs_impact is required: the project doc paths updated in this change, or "none: ". Reports which initiatives became ready, and any milestone it reaches (milestones).
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"ref": "<ref>"
},
"name": "complete"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| ref | Yes | Initiative (ticket/issue): "collection#n" (e.g. "lgm#22"), a bare number, or a path. | |
| collection | No | ||
| docs_impact | No | Project doc paths updated in this change, relative to the repository root (bare paths, no notes) — not initiative files; or "none: <reason>". Required, except for spikes (defaults to none). |