Skip to main content
Glama
RecurPost MCP Server
by dinwal

draft_schedule

Schedules an existing draft for publication at a specified date and time, converting it into a queued post while retaining its draft id as the post id.

Instructions

Schedule a draft at schedule_date_time (YYYY-MM-DD HH:MM:SS in each account's timezone, or ISO 8601 with an offset). The draft keeps its id, which then serves as the post id.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "draft_id": "<draft_id>",
      "schedule_date_time": "<schedule_date_time>"
    },
    "name": "draft_schedule"
  }
}

Input Schema

NameRequiredDescriptionDefault
draft_idYesEncrypted draft id from /api/draft_save or /api/draft_list.
workspace_idNoWorkspace to act in (ws_id from workspace_list). Omit to use your default workspace.
schedule_date_timeYesPublish time. YYYY-MM-DD HH:MM:SS (also with T, seconds optional) is wall-clock time in each account's timezone; a value with an offset or Z is one exact moment.

Schema Changelog

Changes observed during successful MCP inspections.

  1. Addedv2.0.0

TDQS

A3.7/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already declare the mutation and open-world profile, and the description adds genuinely non-obvious behavior: timezone interpretation of the timestamp and the fact that the draft id becomes the post id downstream. It stops short of covering rescheduling/overwrite semantics or failure behavior.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Two front-loaded sentences with no filler; the timestamp format is parenthesized rather than buried. Minor redundancy with the schema's schedule_date_time description keeps it from a 5.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

A simple three-parameter mutation with full schema coverage and clear annotations needs little more; the id-becomes-post-id note fills the main downstream gap. Missing only what happens to previously scheduled content and which sibling scheduler to use instead.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100% and the parameter descriptions already explain the draft_id provenance and the wall-clock vs. offset timestamp distinction, so the description's timezone note largely restates the schema. Baseline 3 applies.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

Description opens with a specific verb+resource ('Schedule a draft') and clarifies the effect on the draft's identity ('keeps its id, which then serves as the post id'). It does not, however, differentiate itself from the sibling schedule_create, leaving ambiguity about which scheduling path to take.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines3/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Usage is only implied: the required draft_id makes it clear a draft must already exist (via draft_save/draft_list), but the description never states prerequisites or when to prefer this over schedule_create, so an agent must infer the selection rule.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.