my-epitech-mcp
Server Configuration
Describes the environment variables required to run the server.
| Name | Required | Description | Default |
|---|---|---|---|
| MY_EPITECH_AUDIT | No | Write audit log. | ~/.config/my-epitech/audit.jsonl |
| MY_EPITECH_TOKENS | No | Internal access and refresh tokens. | ~/.config/my-epitech/tokens.json |
| MY_EPITECH_WRITES | No | Must be `1` to register the write tool. | |
| MY_EPITECH_SESSION | No | Saved Microsoft session, for silent re-logins. | ~/.config/my-epitech/session.json |
| MY_EPITECH_MAX_WRITES | No | Real writes per process. | 5 |
Instructions
Guidance the server publishes about itself, which clients place ahead of the tool catalog so the model reads it before choosing anything.
This server publishes no instructions, or was last inspected before Glama recorded them.
Capabilities
Features and capabilities supported by this server
Protocol revision2025-11-25
| Capability | Details |
|---|---|
| tools | {
"listChanged": true
} |
Tools
Functions exposed to the LLM to take actions
| Name | Description |
|---|---|
| epitech_profileB | My cohort: cursus, year, semester, promotion, campus. No login or name. |
| epitech_moulinette_resultsA | Latest automated test run (moulinette / Hermes) of each project this year, newest first: tests passed/total, failure flags (delivery-error, make-error, crash, coding-style-fail…), coding style counts and penalty, coverage. Use project/unit to filter, failing_only for what needs work. |
| epitech_moulinette_runA | One moulinette run in detail: every test with its failure message, coding style errors by rule, coverage, delivery error and traces. Ids come from epitech_moulinette_results. |
| epitech_moulinette_historyB | Every moulinette run of one project, oldest first, to see the progression. unit and slug come from epitech_moulinette_results. |
| epitech_projectsA | My projects this year with deadlines (end, days_left), group size and the last moulinette result. status: current (default), upcoming, past, all. |
| epitech_projectB | One project: description, dates, my group, my activities (kick-off, follow-ups, defenses) with attendance, subject files, and the moulinette runs I can still launch. |
| epitech_project_fileB | Text of one project resource, e.g. the subject PDF (path from epitech_project.resources). PDFs are converted to text. |
| epitech_progressA | Where I stand: credits actually acquired, plus the school's projections (credits obtainable with current registrations, maximum still obtainable, units at risk or lost), skill blocks and learning outcomes, blocking exams (TEPitech…), alerts, XP and streak. Projections are not acquired credits: never present them as such. |
| epitech_marksA | Published marks and evaluation grids (defenses, reviews, pitches, exams), newest first, with criteria and evaluator comments. Evaluators are not named. since filters by date. Dates are local time (Europe/Paris): 'YYYY-MM-DD' (midnight) or 'YYYY-MM-DD HH:MM'. |
| epitech_peer_evaluationsB | Peer evaluations I must do (status) and the marks and comments my peers gave me. |
| epitech_notificationsC | The intranet notification feed: registrations, cancellations, schedule changes, published results. |
| epitech_invitationsC | Pending invitations to join a project group. |
| epitech_github_statsA | My commits and lines added/deleted on the Epitech GitHub organisations, optionally between two dates (YYYY-MM-DD). |
| epitech_school_calendarC | School and company weeks of my year (training planning). |
Prompts
Interactive templates invoked by user choice
| Name | Description |
|---|---|
No prompts | |
Resources
Contextual data attached and managed by the client
| Name | Description |
|---|---|
No resources | |
TDQS
Scored across 14 tools
Most tools target clearly distinct resources (marks, notifications, invitations, calendar, GitHub stats), and the moulinette trio is well separated by scope: list summaries, one run in detail, one project's history. The only real friction is the singular/plural pair epitech_projects vs epitech_project and the related epitech_project_file, which rely on descriptions to disambiguate list-view versus detail-view.
Every tool follows the same epitech_<noun> snake_case convention with no mixing of styles or verb patterns. Singular/plural is used deliberately and consistently to signal list vs single-item access, which is a predictable scheme an agent can learn.
14 tools is squarely in the well-scoped range for a student intranet surface covering projects, moulinette results, marks, progress, notifications and calendar. Each tool maps to a distinct data area with no filler entries.
Read coverage is strong across the whole lifecycle: projects, deadlines, moulinette runs and history, subject files, marks, peer evaluations, progress, notifications, invitations and calendar. The notable gap is action coverage — epitech_project mentions moulinette runs 'I can still launch,' but no tool exists to launch a run, accept an invitation, or register/deregister from a project.