List project crew hours
list_project_crew_hoursReads a project's time cards to list logged hours and labor cost by employee, day, and cost code, with per-employee and project totals and an optional date range.
Instructions
Hours and labor cost logged on one project, per employee and per day and cost code.
Reads the time logged on a Contractor Foreman project (the project's Time Cards tab): every entry with the day, employee, cost code, regular and overtime hours and labor cost, plus a sum per employee (most hours first) and the project total. days counts the distinct days an employee logged. Cost uses the wages in the Directory and is 0 when no wage is set. Optional date range.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"project_id": "<project_id>"
},
"name": "list_project_crew_hours"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| end_date | No | Hours up to this day, YYYY-MM-DD. | |
| project_id | Yes | The project's numeric id (list_projects). | |
| start_date | No | Hours from this day on, YYYY-MM-DD. |