Skip to main content
Glama
Jira MCP Server

Jira MCP Server

by cbagula

jira_bulk_transition_issues

Transitions multiple Jira issues to the same status at once. Validates transitions before applying and returns detailed results for workflow management.

Instructions

Transitions multiple Jira issues to the same status simultaneously. Validates transitions before applying and provides detailed results. Perfect for workflow management.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "issueKeys": "<issueKeys>",
      "transition": "<transition>"
    },
    "name": "jira_bulk_transition_issues"
  }
}

Input Schema

NameRequiredDescriptionDefault
commentNoOptional comment to add during transition
issueKeysYesArray of issue keys to transition
transitionYesTransition name to apply to all issues (e.g., "Start Progress", "Ready for QA", "Close")
validateTransitionsNoWhether to validate transitions before applying. Default: true

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observedv1.2.0

TDQS

C2.8/5.0
Behavior2/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

With no annotations, the description carries the full burden for a bulk mutation. It mentions pre-validation and "detailed results," but says nothing about what happens on partial failure (do successful issues stay transitioned?), required permissions, atomicity, or rate limits — the exact traits an agent needs before firing a bulk write.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness3/5

Is the description appropriately sized, front-loaded, and free of redundancy?

The core behavior is front-loaded in the first sentence, which is good. The closing sentence "Perfect for workflow management" is pure filler that does not earn its place, and the middle sentence is vague about what "detailed results" means.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness2/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

For a bulk mutation tool with no annotations and no output schema, the definition is thin: it never explains the shape of the "detailed results," how per-issue failures are reported, or whether the operation is all-or-nothing. An agent would have to call it blind to learn its failure semantics.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema description coverage is 100%, so all four parameters are already documented, making 3 the baseline. The description adds only that the same transition applies to every issue, which is a minor clarification rather than new meaning beyond the schema.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

"Transitions multiple Jira issues to the same status simultaneously" gives a specific verb, resource, and bulk scope that separates it from the single-issue sibling jira_transition_issue. It does not name that sibling or jira_bulk_update_issues explicitly, so the differentiation is implied rather than stated.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines2/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

The only usage framing is the vague marketing line "Perfect for workflow management," which does not tell an agent when to pick this over jira_transition_issue or jira_bulk_update_issues. No prerequisites, no exclusions, and no condition under which bulk is preferred are given.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.