Skip to main content
Glama
Commish MCP Server

Commish MCP Server

preview_comp_plan

Preview a compensation plan before creating it, showing all plan values in a formatted summary so the user can confirm the details are correct.

Instructions

Preview a compensation plan BEFORE creating it. ALWAYS call this before create_comp_plan to show the user exactly what will be created and get their confirmation. Returns a formatted summary of all plan values. Only proceed with create_comp_plan after the user confirms the preview looks correct.

Tool call template

This tool declares no required parameters. Add optional parameters from the input schema as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {},
    "name": "preview_comp_plan"
  }
}

Input Schema

NameRequiredDescriptionDefault
nameNoName of the compensation plan (e.g., 'AE Standard Plan FY2025', 'Enterprise AE Plan').
statusNoInitial plan status. 'draft' = not yet live (default), 'active' = currently in use, 'archived' = retired.
user_idNoID of the user (rep) this plan is assigned to. Can be left unset and assigned later via assign_comp_plan.
plan_typeNoPlan type identifier (e.g., 'ae', 'sdr', 'manager'). Default: 'ae'. Free-form string for categorization.
base_salaryNoAnnual base salary in dollars (e.g., 80000 for $80,000). Pass the exact dollar amount. Example: user says '$90K' → pass 90000. Used for total compensation calculations.
ramp_monthsNoNumber of months for quota ramp-up period (e.g., 3 = 3-month ramp). During ramp, quota is prorated. Default: 0 (no ramp).
fiscal_year_idNoID of the fiscal year this plan belongs to. Optional — used to group plans by fiscal period.
arr_quota_annualNoAnnual ARR quota in dollars. Pass the exact quota amount. Example: user says '$400K quota' → pass 400000. Used to calculate attainment percentage and trigger accelerators.
wnc_quota_annualNoAnnual secondary metric quota in dollars or units. Pass the exact quota amount the user states.
effective_start_dateNoPlan effective start date in ISO 8601 format (YYYY-MM-DD). When the plan takes effect.
variable_compensationNoTarget variable compensation in dollars at 100% quota attainment. Pass the exact dollar amount the user states as variable/bonus target. Example: user says '$80K variable' → pass 80000.
arr_annual_acceleratorNoARR accelerator multiplier applied when 100% annual quota is reached (e.g., 2.0 = double the base ARR rate). Typical range: 1.0–3.0.
wnc_annual_acceleratorNoSecondary metric accelerator multiplier applied when 100% annual secondary quota is reached (e.g., 2.0 = double the base rate).
arr_variable_percentageNoARR WEIGHT — what fraction of variable compensation is tied to ARR. This is NOT a commission rate. Example: if 60% of variable comp comes from ARR, pass 0.60. If 100% from ARR (single metric), pass 1.0. The actual commission rate is calculated by the system (variable × weight / quota).
wnc_variable_percentageNoSecondary metric WEIGHT — what fraction of variable compensation is tied to the secondary metric. NOT a commission rate. Example: if 40% from secondary, pass 0.40. arr_variable_percentage + wnc_variable_percentage should equal 1.0.
arr_quarterly_acceleratorNoARR accelerator multiplier applied when quarterly attainment milestone is hit (e.g., 1.5 = 1.5× the base ARR rate). Typical range: 1.0–3.0.

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observedv1.0.0

TDQS

A4.4/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

With no annotations, the description carries the full burden, and it does establish that this is a non-mutating preview step whose output is a formatted summary — the key behavioral fact for a 16-parameter tool. It does not explicitly state that nothing is persisted or what happens on invalid input, so it stops short of full disclosure.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness5/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Three short sentences, front-loaded with the core action and the mandatory sequencing, with no filler or repetition. Each sentence adds distinct information (what it does, when to call it, when to proceed).

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

For a 16-parameter tool with no output schema and no annotations, the description covers the essential workflow and return format well enough to call correctly. Minor gaps remain around persistence guarantees and error/validation behavior, but nothing critical is missing for a preview step.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema description coverage is 100%, so all 16 parameters are already documented in the schema. The description adds only the generic phrase 'all plan values' and no syntax, defaults, or interpretation guidance beyond that, so the baseline of 3 applies.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose5/5

Does the description clearly state what the tool does and how it differs from similar tools?

States a specific verb and resource ('Preview a compensation plan') and distinguishes it from the sibling create_comp_plan by describing it as a pre-creation step. The added clause about returning a formatted summary of all plan values tells the agent what it gets back, so intent is unmistakable.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines5/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Explicitly prescribes the workflow: ALWAYS call before create_comp_plan, show the user the preview, and only proceed after confirmation. The alternative (create_comp_plan) and the condition that selects it are named outright, leaving nothing to inference.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.