Skip to main content
Glama
OpenProject MCP Server

OpenProject MCP Server

by billmal071

get_project_summary

Retrieve a project's work package summary with counts by status and assignee, plus overdue item totals, to assess progress and identify workload issues.

Instructions

Get a summary of work packages for a project including counts by status, assignee, and overdue items

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "project_id": "<project_id>"
    },
    "name": "get_project_summary"
  }
}

Input Schema

NameRequiredDescriptionDefault
project_idYesThe numeric ID of the project

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observedv1.0.0

TDQS

A3.5/5.0
Behavior3/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

No annotations are supplied, so the description carries the burden. It does disclose the shape of the result (counts by status, assignee, overdue), which is the key behavioral trait, but omits the counting scope (all work packages vs. open only), any permission requirements, and whether overdue counts overlap with status counts.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

A single front-loaded sentence with zero filler, and the aggregate content is stated up front. It is efficient, though the trailing 'including...' enumeration reads as a list rather than structured guidance.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

For a one-parameter read tool with no output schema, the description does the essential work of explaining what the returned summary contains. The remaining gap is interpretive scope — whether counts include closed or all work packages — which affects how an agent reads the result.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100% for the single project_id parameter, so the schema already explains it. The description reinforces that the scope is one project, but adds no format or validation detail beyond the schema.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description gives a clear verb+resource ('Get a summary of work packages for a project') and enumerates the aggregate content (counts by status, assignee, overdue). It never distinguishes this aggregate view from siblings like get_team_workload or list_work_packages, so an agent must infer which one to call.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines3/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

The 'summary' framing implies this is for an aggregate overview rather than raw listing, which is implied usage guidance. No explicit when-to-use, when-not-to-use, or named alternative (e.g. list_work_packages for full detail) is provided.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.