Skip to main content
Glama
BatiControl Engineering MCP Connector

BatiControl Engineering MCP Connector

by antica-labs
README.md
# BatiControl Engineering — Official B2A & Enterprise MCP Connector (`v1.0.0`)

Construction engineering, quantity surveying, and site compliance connector for BatiControl (mcp.crh.fr): DPGF quote & 25% margin floor benchmarking, Law No. 75-1334 subcontracting clearance, PLU/BIM parcel feasibility, statutory construction warranties, and decennial insurance watch.

## Sovereign Endpoints & Discovery
| Surface | URL |
| :--- | :--- |
| **MCP Streamable HTTP** | `https://mcp.crh.fr/mcp` |
| **MCP Discovery & SLA Beacon** | `https://mcp.crh.fr/.well-known/mcp.json` |
| **Perplexity Connector Manifest** | `https://mcp.crh.fr/.well-known/mcp-connector.json` |
| **A2A Agent Card** | `https://mcp.crh.fr/.well-known/agent-card.json` |
| **OAuth 2.1 Protected Resource (RFC 9728)** | `https://mcp.crh.fr/.well-known/oauth-protected-resource` |
| **OAuth 2.1 Authorization Server (RFC 8414)** | `https://mcp.crh.fr/.well-known/oauth-authorization-server` |
| **OpenAPI 3.1.0 Spec** | `https://mcp.crh.fr/openapi.json` |
| **Agent Index (`llms.txt`)** | `https://mcp.crh.fr/llms.txt` |

## Primary `Output-First` Tools
- `benchmark_dpgf_quotes_and_margin_floor`: Benchmarks contractor DPGF line items against market unit prices and enforces the 25% gross margin floor.
- `audit_loi_1975_subcontracting_compliance`: Audits Law No. 75-1334 subcontracting compliance (owner acceptance, payment terms, Art. 14 bank guarantee).
- `simulate_plu_and_bim_parcel_feasibility`: Simulates parcel buildable envelope, PLU setback/height ratios, and parametric BIM floor-area yield.
- `certify_construction_warranty_schedule`: Certifies statutory reception milestones (GPA 1-year, biennial 2-year, decennial 10-year Art. 1792 CC).
- `reconcile_monthly_progress_billing_art4`: Reconciles monthly contractor progress statements (situations de travaux), retention money, and penalties.
- `stage_technical_controller_escalation`: Zero-cost (0 EUR) B2A2H escalation to BatiControl Technical Control & Engineering specialists.
- `subscribe_decennale_and_urssaf_drift`: Subscribes to signed JWS webhooks alerting on subcontractor decennial insurance or URSSAF vigilance expiry.
- `search`: Canonical search across construction operations, DPGF lots, and compliance clearances.
- `fetch`: Canonical deterministic retrieval of an operation, lot benchmark, or warranty certificate.

## Guarantees
- **Zero Data Retention (`ZDR`)**: `X-Data-Retention: zero`, `X-Training-On-Payloads: false`, EU sovereign processing (`EU-FR-LU`).
- **AST Prompt-Injection Defense**: 6-layer deterministic sanitizer (`X-Prompt-Injection-Sanitized: ast-v2`).
- **Cryptographic Opposability**: `SHA-256` payload digest + dual qualified `RFC 3161` timestamps + `0,00 EUR` counterparty verification at `https://mcp.crh.fr/verify/<proof_id>`.