Skip to main content
Glama

Timed beat sheet

beat_sheet

Lay a script on a timeline with estimated start/end timecodes, sections, and stage-direction placements, then export Markdown or CSV to plan shots, b-roll, and graphics before shooting.

Instructions

Lay the script on a timeline for the edit: every sentence with estimated start/end timecode and section, plus where each stage direction (B-roll, SFX, on-screen text) lands. Export as Markdown or CSV for planning shots, b-roll and graphics before the shoot.

Tool call template

This tool declares no required parameters. Add optional parameters from the input schema as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {},
    "name": "beat_sheet"
  }
}

Input Schema

NameRequiredDescriptionDefault
wpmNoCustom words per minute (overrides pace). Measure yours with estimate_duration + actual_seconds.
paceNoslow 130 · conversational 150 · energetic 170 (typical Reels/TikTok) · fast 190 words per minute.energetic
pathNoOr a local .txt / .md file. ~ is expanded.
textNoThe script text.
formatNomarkdown
overwriteNo
output_pathNo

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observedv1.0.0

TDQS

B3.2/5.0
Behavior3/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations declare readOnlyHint=false and destructiveHint=false, so the agent knows this writes something but not destructively. The description's 'export as Markdown or CSV' corroborates a file-producing operation, but it never explains what output_path does, why an 'overwrite' flag exists, or whether an existing file would be replaced — exactly the kind of context a non-readOnly tool needs.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Two dense sentences that front-load the core operation and follow with output content and purpose. No filler, though the colon-chained clauses pack a lot into each sentence and the trailing purpose clause is the only part that could be trimmed.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness3/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

With no output schema, the description usefully spells out what the result contains (timecodes, sections, stage directions), which is the right compensation. However, for a 7-parameter, non-readOnly tool it leaves file-writing semantics (output_path, overwrite) entirely unexplained, so an agent cannot safely predict side effects.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters2/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 57%, so several parameters rely on the description for meaning, yet it adds nothing about wpm, pace, path, overwrite, or output_path. The only mapping is 'Markdown or CSV', which merely restates the existing `format` enum values.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description gives a concrete verb and resource ('Lay the script on a timeline for the edit') and specifies the output precisely: per-sentence start/end timecodes, section labels, and stage-direction placement. That distinguishes it from estimate_duration and script_to_srt in substance, though it never names a sibling explicitly.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines3/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

It states a use context ('for planning shots, b-roll and graphics before the shoot'), which implies when to reach for it. There is no explicit when-not guidance and no named alternative for cases where a plain duration estimate or SRT would be the better choice.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.