report_saturation
Notify supervisor of evidence-backed saturation to trigger automatic transition to next improvement lane.
Instructions
Tell the supervisor the current lane (e.g. the Strip Miner) has reached evidence-backed saturation. The supervisor AUTO-TRANSITIONS to the next lane (Strip Miner → Loop-de-loop, or the next improvement branch). It never pauses, awaits the operator, or treats "no re-mining warranted" as terminal — saturation is a pivot. The operator is the only stop condition.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| runId | Yes | ||
| evidence | No | the saturation evidence (batches that changed nothing material) |