Skip to main content
Glama

Server Configuration

Describes the environment variables required to run the server.

NameRequiredDescriptionDefault
PR_REVIEW_LOGNoSet to `debug` in the MCP server environment to enable debug stage logging (e.g. `PR_REVIEW_LOG=debug`).

Instructions

Guidance the server publishes about itself, which clients place ahead of the tool catalog so the model reads it before choosing anything.

This server publishes no instructions, or was last inspected before Glama recorded them.

Capabilities

Features and capabilities supported by this server

Protocol revision2025-11-25

CapabilityDetails
tools
{
  "listChanged": true
}
logging
{}

Tools

Functions exposed to the LLM to take actions

NameDescription
configure_projectA

Register or update a project in the PR review config. Run this once per project.

list_projectsB

List all configured projects.

pr_reviewB

Run staged keyless PR review. Host must chain prepare -> validate/repair using nextAction.callTemplate.

Prompts

Interactive templates invoked by user choice

NameDescription

No prompts

Resources

Contextual data attached and managed by the client

NameDescription

No resources

TDQS

B3.4/5.0

Scored across 3 tools

Disambiguation4/5

The three tools target clearly different operations: project registration, project listing, and running a review. The only mild ambiguity is that pr_review bundles a multi-stage prepare/validate/repair workflow into one tool, making its exact behavior less obvious from the surface, but it does not overlap with the config tools.

Naming Consistency4/5

configure_project and list_projects follow a clean verb_noun pattern, while pr_review deviates to a noun-style name. The deviation is minor and still readable, so the set is mostly consistent.

Tool Count4/5

Three tools is on the lean side but each serves a distinct role in a narrow domain (configure, list, review). It is well-scoped for a focused PR review server, though slightly thin.

Completeness3/5

The surface covers project setup and running a review, but there is no way to remove/update a project explicitly, inspect past review results, or check status outside the chained pr_review flow. These are notable gaps that could force agents into awkward workarounds.

Maintenance

ActivityInactive
ResponsivenessOutdated data