Skip to main content
Glama

create_task

Create a task in Reclaim.ai for auto-scheduling, defining time in 15-minute chunks, priority from P1 to P4, due dates, and chunk size limits.

Instructions

Create a new task in Reclaim for auto-scheduling. Time is specified in 15-minute chunks (e.g. timeChunksRequired=4 means 1 hour). Priority goes from P1 (highest) to P4 (lowest).

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "title": "<title>"
    },
    "name": "create_task"
  }
}

Input Schema

NameRequiredDescriptionDefault
dueNoDue date — YYYY-MM-DD (converted to end-of-day) or full ISO 8601 datetime
notesNoTask description or notes
titleYesTask title
onDeckNoWhether the task is on deck (prioritized for today)
priorityNoPriority level: P1 (highest) to P4 (lowest)
snoozeUntilNoDon't schedule before this date — YYYY-MM-DD (converted to start-of-day) or full ISO 8601 datetime
maxChunkSizeNoMaximum scheduling block in 15-min chunks
minChunkSizeNoMinimum scheduling block in 15-min chunks
alwaysPrivateNoHide task title on shared calendars
eventCategoryNoWORK or PERSONAL
timeChunksRequiredNoTime needed in 15-minute chunks (e.g. 4 = 1 hour)

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observedv0.1.0

TDQS

B3.2/5.0
Behavior3/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

No annotations are supplied, so the description carries the full disclosure burden. It does convey meaningful domain behavior — that the task will be auto-scheduled and that durations are counted in 15-minute chunks — but it omits the side effects that matter for a write tool: whether calendar events are created immediately, whether the call is idempotent, and what the response contains.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Three short sentences with no filler, and the core purpose is front-loaded ahead of the units and priority conventions. The unit and priority notes are useful but partially redundant with the schema.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness3/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

For an 11-parameter mutation tool with no annotations and no output schema, the description is thin: it never says what is returned, whether scheduling happens synchronously, or how due/snoozeUntil/onDeck interact. The chunk and priority conventions are covered, but the operational picture is incomplete.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema description coverage is 100%, so the schema already documents all 11 parameters. The description repeats the 15-minute chunk convention and the P1–P4 scale, both of which are already stated in the schema, so it adds little beyond the structured data. Baseline 3 is appropriate.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description gives a precise verb and resource ('Create a new task in Reclaim') and adds the qualifier 'for auto-scheduling', so an agent can tell this apart from update_task, add_time_to_task, or create_habit. It stops short of explicitly naming a sibling it is not.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines2/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

There is no when-to-use or when-not-to-use guidance. Nothing tells the agent to prefer add_time_to_task or update_task when a task already exists, or what preconditions (e.g. an active Reclaim account, a schedule) apply to auto-scheduling.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.