Skip to main content
Glama

save_current_detail

Save the detailed route for the current phase as JSON, capturing tasks, steps, resources, priorities, and check-in goals so your career roadmap stays structured and trackable.

Instructions

保存当前阶段的详细路线。

Args: detail_json: 详细路线的 JSON 字符串

Schema(与 sop/detailed_route.yaml 一致): { "phase_id": "phase_1", "tasks": [ { "name": "LeetCode 热题 100:数组与字符串 5 题", "description": "...", "how_to": ["先想 10 分钟", "再写代码", "错题隔天重做"], "resources": [ {"label": "LeetCode 热题 100", "url": "https://leetcode.cn/problem-list/2cktkvj/"} ], "done_criteria": "独立写出 5 题并通过,错题已记录", "priority": "high", "checkin_mode": "daily", "checkin_goal": 5 } ] }

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "detail_json": "<detail_json>"
    },
    "name": "save_current_detail"
  }
}

Input Schema

NameRequiredDescriptionDefault
detail_jsonYes

Output Schema

NameRequiredDescriptionDefault
resultYes

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observedv0.3.0

TDQS

B3.1/5.0
Behavior2/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

No annotations are supplied, so the description carries the full burden. It says 'save' but never discloses whether an existing detail is overwritten or merged, whether prior phases must exist, what validation applies to the JSON string, or how failures are surfaced. The embedded schema example describes payload shape, not behavior, so the mutation semantics remain undisclosed.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Purpose is front-loaded in one sentence, and the bulk of the text is a payload example that earns its place for an untyped JSON-string parameter. Minor waste in the 'Args: detail_json' line, which restates what the example already shows.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness3/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

An output schema exists, so return values need not be described. However, for a write tool with zero annotations, the missing overwrite/idempotency and precondition information leaves a real gap that the payload example does not close.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters4/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 0% and the single parameter is an opaque string, so the description must compensate — and it does, with a concrete annotated JSON example showing phase_id, tasks, how_to, resources, done_criteria, priority, checkin_mode and checkin_goal. It falls short of a 5 because field meanings and the allowed values for fields like priority and checkin_mode are only illustrated, never enumerated.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

The opening line gives a specific verb plus resource: save the detailed route for the current phase ('保存当前阶段的详细路线'). This is clearly distinct from sibling tools like save_roadmap or save_gap_analysis, though the description never explicitly contrasts itself with them.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines2/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

There is no guidance on when to call this versus alternatives, no prerequisite stated (e.g. that a roadmap or phase must already exist), and no note on what happens if a detail was already saved. The usage is only implied by the tool name and the word '当前阶段'.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.