check_activity
Run connectivity tests for the open activity and retrieve current completion status and score to verify progress.
Instructions
Run the open activity's connectivity tests and return them with the current completion and score, like Check Results.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
No arguments | |||
Output Schema
| Name | Required | Description | Default |
|---|---|---|---|
| status | Yes | ||
| connectivity | Yes | ||
| connectivity_results | Yes | One line per connectivity test, as Packet Tracer reports it. |