Skip to main content
Glama
Sushmitha26

Employee Leave Management MCP Server

by Sushmitha26

Server Configuration

Describes the environment variables required to run the server.

NameRequiredDescriptionDefault

No arguments

Instructions

Guidance the server publishes about itself, which clients place ahead of the tool catalog so the model reads it before choosing anything.

This server publishes no instructions, or was last inspected before Glama recorded them.

Capabilities

Features and capabilities supported by this server

Protocol revision2025-11-25

CapabilityDetails
tools
{
  "listChanged": false
}
prompts
{
  "listChanged": false
}
resources
{
  "subscribe": false,
  "listChanged": false
}
experimental
{}

Tools

Functions exposed to the LLM to take actions

NameDescription
apply_for_leaveA

Submit a leave request for an employee.

Dates use ISO format (YYYY-MM-DD). The number of working days is computed automatically and checked against the remaining balance. Returns the created request as a dictionary.

approve_leaveC

Approve a pending leave request and deduct the days from the balance.

reject_leaveB

Reject a pending leave request. The balance is left unchanged.

cancel_leaveA

Cancel a leave request. If it was already approved, the days are credited back to the employee's balance.

list_pending_requestsB

List all pending leave requests for employees reporting to a manager.

check_leave_balanceA

Return the remaining balance for each leave type for an employee.

Prompts

Interactive templates invoked by user choice

NameDescription
draft_leave_requestprompt to draft a polite leave request message.
draft_decisionprompt to draft a manager's decision message.

Resources

Contextual data attached and managed by the client

NameDescription
get_leave_policyRead the standard annual leave entitlement policy.

TDQS

A3.5/5.0

Scored across 6 tools

Disambiguation4/5

Each tool targets a distinct lifecycle action (apply, approve, reject, cancel, list, check) with no obvious overlaps. The only minor potential confusion is between approve/reject/cancel, all acting on pending requests, but their differing effects on balance make them clearly distinct.

Naming Consistency5/5

All tools follow a consistent verb_noun naming pattern (apply_for_leave, approve_leave, reject_leave, cancel_leave, list_pending_requests, check_leave_balance). The verbs are clear and uniform, with snake_case throughout.

Tool Count5/5

Six tools is well-scoped for a leave management domain, covering the full request lifecycle plus balance and listing queries. No tool feels redundant or unnecessary, and none are missing within the core scope.

Completeness4/5

The surface covers the full request lifecycle (apply, approve, reject, cancel) plus balance checking and pending listing. Minor gaps exist—such as no update_leave for modifying a request or a get_leave for viewing individual approved requests—but core workflows are covered.

Maintenance

ActivitySlowing
ResponsivenessNo issues