get_optimization_result
Retrieve measured results, validation status, and local patch or report paths for a given optimization run. Use accepted=false to confirm no harness-approved changes before parent review.
Instructions
Read measured results, final validation, and local patch/report paths. accepted=false means no changes are approved by the harness. Parent review is still required.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| run_id | Yes |