price_bom
Calculate DigiKey costs for a bill of materials with packaging per line, line and grand totals, and warnings for missing, out-of-stock, or obsolete parts.
Instructions
Cost a bill of materials on DigiKey: best packaging per line, line totals, grand total, and warnings for missing, out-of-stock or obsolete parts.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"items": "<items>"
},
"name": "price_bom"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| items | Yes | ||
| build_quantity | No | Number of boards; each line quantity is multiplied by this |
Output Schema
| Name | Required | Description | Default |
|---|---|---|---|
No arguments | |||