MCP Task Manager Server_updateTask
Update task details such as description, priority, or dependencies within a project by providing the project and task IDs. Returns the full details of the modified task upon success.
Instructions
Updates specific details of an existing task within a project. Requires the project ID and task ID. Allows updating description, priority, and/or dependencies. At least one optional field (description, priority, dependencies) must be provided. Returns the full details of the updated task upon success.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"project_id": "<project_id>",
"task_id": "<task_id>"
},
"name": "MCP Task Manager Server_updateTask"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| dependencies | No | Optional. The complete list of task IDs (UUIDs) that this task depends on. Replaces the existing list entirely. Max 50 dependencies. | |
| description | No | Optional. The new textual description for the task (1-1024 characters). | |
| priority | No | Optional. The new priority level for the task ('high', 'medium', or 'low'). | |
| project_id | Yes | The unique identifier (UUID) of the project containing the task to update. This project must exist. | |
| task_id | Yes | The unique identifier (UUID) of the task to update. This task must exist within the specified project. |