context_budget_verify
Verify an applied context-budget plan to catch missed edits, manual drift, or preserve-span violations and confirm remaining tokens and budget satisfaction.
Instructions
Use after applying a context-budget plan to catch missed edits, manual drift, or preserve-span violations. Input: the planId returned by context_budget_plan. Returns applied and missed finding IDs, violations with file and line ranges, remaining tokens, and satisfied. Do not consider the budget met until satisfied is true.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"planId": "<planId>"
},
"name": "context_budget_verify"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| planId | Yes |