Skip to main content
Glama

get_runtime_status

Checks portable CAD reader and GIS runtime readiness to confirm conversion prerequisites before starting a CAD-to-GIS job.

Instructions

Report portable reader and GIS runtime readiness.

Input Schema

NameRequiredDescriptionDefault

No arguments

Output Schema

NameRequiredDescriptionDefault

No arguments

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observedv0.8.0

TDQS

C2.9/5.0
Behavior2/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

No annotations are provided, so the description carries the full burden of behavioral disclosure. 'Report' implies a read-only operation, but the description does not state side effects, whether any runtime probing or installation occurs, what 'readiness' means operationally, or what evidence it uses. The output schema helps with return values but not with behavioral traits.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

A single front-loaded sentence with no filler. It is efficient, though its brevity contributes directly to the under-specification noted elsewhere rather than being a model of compact clarity.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness3/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

The output schema covers return values, and a zero-parameter read-only status tool has limited surface area. Still, the description does not explain what 'portable reader' and 'GIS runtime readiness' mean or how this differs from install_runtime/get_capabilities, leaving the agent with an incomplete mental model for selection.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters4/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

The tool takes zero parameters, which is the baseline-4 case. There is nothing for the description to add semantically, and the empty schema is consistent with a parameterless status report.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose3/5

Does the description clearly state what the tool does and how it differs from similar tools?

The verb 'Report' and the object 'readiness' are identifiable, but 'portable reader and GIS runtime' is opaque jargon that doesn't map cleanly to any sibling tool's domain. It does not distinguish itself from nearby status tools like get_capabilities, get_cad_bundle_status, or inspect_run, so an agent cannot confidently pick it from the name alone.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines2/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

There is no when-to-use guidance, no prerequisites, and no named alternative. The agent is left to infer that this is a health/readiness check versus get_capabilities or install_runtime from context alone.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.