Skip to main content
Glama

گزارش‌ها و مانیتورینگ

mizito_reports
Read-only

Generate management reports on workload, delays, project health, meeting minutes, and CRM customers from Mizito monitoring data. Requires workspace admin or monitoring access.

Instructions

Management reports from Mizito's monitoring section (مانیتورینگ). Useful for analysing workload, delays and activity. Needs workspace admin rights, or monitoring access to advanced projects.

Input Schema

TableJSON Schema
NameRequiredDescriptionDefault
reportYesworkspace = overall activity; member = one member's profile and workload (user_id); project = one project's health (project_id); projects_summary = every project's open/overdue/done tasks, longest delay and largest inbox; done_percent_30_days = share of tasks done on time over 30 days per project; minutes = meeting minutes matching filters; customers = CRM customer files; chart_* = daily counts (workspace, or one member with user_id).
searchNoFor minutes: text to search in the minutes.
to_dateNoFor customers: created until (ISO or Jalali).
user_idNoMember for report=member or a chart_* for one member.
from_dateNoFor customers: created from (ISO or Jalali).
project_idNoProject for report=project, or filter for minutes.
project_label_idNoFor projects_summary / done_percent_30_days: only projects with this label.

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observedv0.3.1

TDQS

A3.9/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already declare readOnlyHint=true and openWorldHint=true, so the safety profile is covered. The description adds materially by disclosing the authorization requirement (admin rights or monitoring access), which tells the agent this call can fail on permissions. It stops short of describing the report payload or latency.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Three short sentences with purpose and access front-loaded ahead of the use-case hint; no filler. Slightly tighter ordering (purpose, access, use-cases) would make it a 5, but nothing is wasted.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

For a read-only, 7-param reporting tool with no output schema and full schema coverage, the description supplies the missing pieces an agent needs: what the reports are, who can call it, and roughly why. It could note that report selection drives all other params, but the enum schema carries most of that.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema description coverage is 100% and the enum already documents all 14 report types and the conditional role of user_id, project_id, project_label_id, from/to dates and search. The description adds no parameter meaning of its own, so baseline 3 applies.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

States a specific resource (management reports from the monitoring section) and its domain (workload, delays, activity), which lets an agent place it as the reporting aggregator among siblings. It does not explicitly contrast itself with the nearest siblings (e.g. mizito_dashboard), so it stops short of full differentiation.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines4/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Gives concrete context ('useful for analysing workload, delays and activity') and the access prerequisite ('needs workspace admin rights, or monitoring access to advanced projects'). It doesn't name when-not-to-use or point at alternative tools, but the contextual signal is clear.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.