production_kpis
Retrieve a period-over-period management summary of factory performance for a date range, covering OEE, good/scrap parts, downtime reasons, delivery, late orders, and inventory alerts.
Instructions
Management summary for a period, compared with the previous period of the same length: OEE and its three factors, good and scrap parts, unplanned downtime hours with the top reasons, on-time delivery, open late orders and materials below reorder point.
Tool call template
This tool declares no required parameters. Add optional parameters from the input schema as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {},
"name": "production_kpis"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| date_to | No | ISO date YYYY-MM-DD | |
| date_from | No | ISO date YYYY-MM-DD |
Output Schema
| Name | Required | Description | Default |
|---|---|---|---|
No arguments | |||