create_note_for_task
Create a note linked to a specific task by providing the task ID and note content, so task-related context stays attached to the right work item.
Instructions
Create a note linked to a specific task
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"task_id": "<task_id>",
"content": "<content>"
},
"name": "create_note_for_task"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| content | Yes | Note content (required) | |
| task_id | Yes | ID of the task to link the note to (required) |