gradescope_activate_submission
Make an earlier Gradescope submission the active graded one, replacing the current active submission. Use a dry run first and confirm before activating.
Instructions
Make one of your earlier submissions the active (graded) one, replacing the current active submission. Only use when the user explicitly asks. Always call with dryRun: true first, show which submission becomes active, and wait for the user to confirm.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"courseId": "<courseId>",
"assignmentId": "<assignmentId>",
"submissionId": "<submissionId>"
},
"name": "gradescope_activate_submission"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| dryRun | No | Validate and return the plan without sending | |
| account | No | Saved account to use (see minerva_list_accounts). Only needed when several accounts are saved and the user has not chosen one yet. | |
| confirm | No | Must be true to actually send. Only set it after showing the user the dryRun plan and getting their explicit yes. | |
| courseId | Yes | Gradescope course number like "1234567" (from gradescope_list_courses), or a module code like "COMP3620" | |
| assignmentId | Yes | Assignment id (from gradescope_list_assignments) or a unique part of its title, e.g. "Perceptron" | |
| submissionId | Yes | The earlier submission to activate (from gradescope_list_submissions) |