pvsyst_run_engineering_task
Preview or run an isolated engineering revision of a PVsyst project, applying explicit tilt, tracking, loss or AC storage changes and producing native hourly-year results for review.
Instructions
[Engineering] Preview or execute an isolated revision of a fixed/UnlimTracking or existing AC-storage project. State the engineering objective, nameplate kWp/source and explicit supported changes. Existing equipment/counts/weather stay inherited; no model fitting or sizing inference. Existing AC storage accepts storage scalar updates and a prepared load_manifest_name; WeakGrid additionally requires the complete availability declaration. The stored load must match its prepared snapshot and site standard UTC offset. Native annual results verify actual load/SOC/AC limits; storage never uses the PV-only E_Grid PR formula. Preview writes nothing. Execution creates a NEW project/VC, reloads via native CLI, runs one complete hourly year, produces native CSV/PDF and records the actual run inputs for comparison and delivery. Existing names stop; failure retains evidence without automatic retry/rollback. Inspect stage and native_consumption_verified as well as status: needs_review can mean a completed run still requiring engineering review.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| spec | Yes | ||
| dry_run | No |