Skip to main content
Glama

Make a spaced repetition schedule

make_spaced_repetition_schedule
Read-onlyIdempotent

Build a spaced repetition schedule with expanding review intervals for a topic, and mark any review date on or after the exam as skipped.

Instructions

Make a spaced repetition schedule for a topic: every review date at expanding intervals from the day you first studied it, with any date on or after the exam marked to skip. Use next_review_dates when you want the next review date only. Dates can be plain text, like Dec 12 or in 3 weeks. Example prompt: "When should I review what I learned today for my exam on 2026-11-30?"

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "topic": "<topic>"
    },
    "name": "make_spaced_repetition_schedule"
  }
}

Input Schema

NameRequiredDescriptionDefault
topicYesTopic you studied.
exam_dateNoExam date, if any. Reviews on or after it are skipped. Use 2026-12-12, or plain text like Dec 12, next Friday or in 3 weeks.
intervals_daysNoDays after the first study to review.
first_study_dateNoThe day you first studied it. Defaults to today. Use 2026-12-12, or plain text like Dec 12, next Friday or in 3 weeks.

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observedv0.1.3

TDQS

A4.4/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Beyond the read-only, non-destructive annotations, it explains that reviews are calculated from the first study date and that entries on or after the exam are marked to skip rather than silently omitted. It does not describe the returned schedule's structure or how relative dates are resolved, so it is informative but not exhaustive.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness5/5

Is the description appropriately sized, front-loaded, and free of redundancy?

The description front-loads the function and cutoff behavior, then presents the alternative, input flexibility, and a short example in a logical order. Its four compact sentences each contribute selection or invocation guidance without substantial repetition.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

Together with the fully described schema and safety annotations, this is enough for an agent to construct a normal call and understand skip behavior. Because there is no output schema, the absence of a return-shape description is a small gap, and the near-duplicate sibling spaced_repetition_dates is not differentiated.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100%, so the baseline is 3 and the schema already documents defaults, interval customization, and accepted date formats. The description reinforces date flexibility and first-study/exam semantics with an example, but adds little parameter information beyond the schema.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose5/5

Does the description clearly state what the tool does and how it differs from similar tools?

The opening sentence identifies the action and resource—making a full review schedule for a topic—and explains the interval origin and exam cutoff. Naming next_review_dates as the next-date-only alternative also distinguishes it from a close sibling.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines5/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

It gives an explicit routing rule: use next_review_dates when only the next review date is wanted, making this tool appropriate for the full schedule. The example prompt supplies a concrete use case involving first study date and exam date.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.