Skip to main content
Glama
mcp-bindplane

mcp-bindplane

by AngelSolisP

rollouts

Control BindPlane incremental configuration deployments to agents: create, start, monitor progress, pause, resume, and update deployments by name.

Instructions

Manage BindPlane rollouts — incremental configuration deployments to agents.

Actions: • list — List all rollouts. No params • create — Create a new rollout for a configuration. Params: name (configuration name) • get — Get rollout details. Params: name • get-status — Get rollout progress (agents updated, errors, etc). Params: name • start — Start deploying a rollout. Deploys incrementally: 3 agents first, then 5x batches every 5s up to 100. Params: name • update — Update a rollout. Params: name • pause — Pause an in-progress rollout. Params: name • resume — Resume a paused rollout. Params: name

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "action": "<action>"
    },
    "name": "rollouts"
  }
}

Input Schema

NameRequiredDescriptionDefault
nameNoConfiguration or rollout name
actionYesAction to perform

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observedv0.1.0

TDQS

A4.1/5.0
Behavior3/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

With no annotations, the description carries the full burden. It does add real behavioral detail for 'start' (3 agents first, then 5x batches every 5s up to 100) and state preconditions for pause/resume, but says nothing about whether start is interruptible/irreversible, what permissions are required, or how failures during a rollout surface.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness5/5

Is the description appropriately sized, front-loaded, and free of redundancy?

One summary sentence followed by a scannable action list with per-action params; nothing is buried and no sentence is wasted. The repeated 'Params: name' is terse and aids scanning rather than padding.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness3/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

For a multi-action mutation tool with no annotations and no output schema, the definition covers the action surface well but leaves gaps: 'update — Update a rollout. Params: name' never says what is actually updated, and the shape of get-status results (progress fields, error counts) is only gestured at.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters4/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100%, so the baseline is 3, but the description earns extra credit by disambiguating the overloaded 'name' parameter per action: it is a configuration name for 'create' and a rollout name for get/get-status/start/pause/resume, and 'list' is explicitly marked as taking no params.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose5/5

Does the description clearly state what the tool does and how it differs from similar tools?

The first line gives a specific verb+resource ('Manage BindPlane rollouts') and immediately glosses the domain concept as 'incremental configuration deployments to agents'. The action enumeration makes it obvious how this differs from siblings like configurations or agents.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines4/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Each action is paired with its intent (list, create, get, get-status, start, pause, resume), which effectively tells the agent which action to pick for a given goal, and state prerequisites are implied ('Pause an in-progress rollout', 'Resume a paused rollout'). It stops short of explicit when-not-to-use guidance or pointing at sibling tools for adjacent tasks such as editing configurations.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.