# tasks.md
## 1. Overview
Implementation tasks for Agent-oriented Spec-Driven Development Support MCP Tool using Work Breakdown Structure (WBS) approach. Focus on incremental delivery with clear dependencies and acceptance criteria.
## 2. Task List
### Phase 1: Foundation
- [ ] **TASK-01-01**: Implement prompt generation engine
- **REQ**: [REQ-02, REQ-04, REQ-06, REQ-08]
- **DC**: **prompt-generator**
- **Dependencies**: None
- **Acceptance Criteria**:
- Criterion 1: Generate EARS format requirements prompts with proper formatting
- Criterion 2: Generate design prompts based on validated requirements
- Criterion 3: Generate WBS format tasks prompts with dependency handling
- Criterion 4: Generate code implementation prompts with precautions
- **Steps**:
1. Create prompt template management system
2. Implement template rendering engine
3. Add context-aware prompt generation
4. Test with sample inputs
- [ ] **TASK-01-02**: Implement question generation engine
- **REQ**: [REQ-01]
- **DC**: **question-generator**
- **Dependencies**: None
- **Acceptance Criteria**:
- Criterion 1: Analyze information sufficiency in user inputs
- Criterion 2: Generate targeted questions for missing information
- Criterion 3: Prioritize questions by importance and urgency
- **Steps**:
1. Create information gap analysis logic
2. Implement question template system
3. Add prioritization algorithms
4. Test with incomplete scenarios
### Phase 2: Validation
- [ ] **TASK-02-01**: Implement document validation engine
- **REQ**: [REQ-03, REQ-05, REQ-07]
- **DC**: **validator**
- **Dependencies**: TASK-01-01
- **Acceptance Criteria**:
- Criterion 1: Validate requirements.md structure and EARS format
- Criterion 2: Validate design.md traceability and component definitions
- Criterion 3: Validate tasks.md dependencies and WBS format
- Criterion 4: Generate specific fix instructions for validation failures
- **Steps**:
1. Create document parser for each spec type
2. Implement validation rules engine
3. Add error message generation
4. Test with valid/invalid documents
- [ ] **TASK-02-02**: Implement traceability management
- **REQ**: [REQ-09, REQ-10]
- **DC**: **traceability-manager**
- **Dependencies**: TASK-02-01
- **Acceptance Criteria**:
- Criterion 1: Track requirements-design-tasks relationships
- Criterion 2: Generate traceability reports with coverage statistics
- Criterion 3: Detect orphaned or missing references
- **Steps**:
1. Create cross-document reference parser
2. Implement relationship mapping logic
3. Add coverage calculation algorithms
4. Test with complex spec sets
### Phase 3: Change Analysis
- [ ] **TASK-03-01**: Implement change impact analysis
- **REQ**: [REQ-09]
- **DC**: **change-analyzer**
- **Dependencies**: TASK-02-02
- **Acceptance Criteria**:
- Criterion 1: Identify affected components when requirements change
- Criterion 2: Generate modification prompts for impacted documents
- Criterion 3: Provide change propagation recommendations
- **Steps**:
1. Create change detection algorithms
2. Implement impact analysis engine
3. Add modification prompt generation
4. Test with various change scenarios
### Phase 4: Integration & Testing
- [ ] **TASK-04-01**: Implement MCP server integration
- **REQ**: [TR-07]
- **DC**: **prompt-validation-scenario**, **validation-accuracy-scenario**
- **Dependencies**: TASK-03-01
- **Acceptance Criteria**:
- Criterion 1: MCP tools expose all functionality correctly
- Criterion 2: Error handling works across MCP interface
- Criterion 3: Performance meets < 1 second requirement
- **Steps**:
1. Create MCP tool wrappers
2. Implement error handling middleware
3. Add performance monitoring
4. Test with real Agent interactions
- [ ] **TASK-04-02**: Comprehensive testing and validation
- **REQ**: [TR-01, TR-02, TR-04, TR-05, TR-06]
- **DC**: **traceability-completeness-scenario**
- **Dependencies**: TASK-04-01
- **Acceptance Criteria**:
- Criterion 1: All unit tests pass with >95% coverage
- Criterion 2: Integration tests validate MCP functionality
- Criterion 3: Performance tests confirm sub-second response times
- Criterion 4: E2E tests validate complete workflow
- **Steps**:
1. Implement comprehensive test suite
2. Add performance benchmarking
3. Create E2E test scenarios
4. Validate against acceptance criteria
## 3. Dependencies
```
TASK-01-01 → TASK-02-01 → TASK-02-02 → TASK-03-01 → TASK-04-01 → TASK-04-02
TASK-01-02 (parallel to TASK-01-01)
```
## 4. Milestones
- **M1**: Foundation completion (TASK-01-01, TASK-01-02 completed) - Core prompt and question generation ready
- **M2**: Validation completion (TASK-02-01, TASK-02-02 completed) - Document validation and traceability operational
- **M3**: Change Analysis completion (TASK-03-01 completed) - Impact analysis functional
- **M4**: Full Integration (TASK-04-01, TASK-04-02 completed) - Production-ready MCP server
## 5. Risks and Mitigation
- **Risk**: Template complexity affecting prompt quality
- Affected Tasks: TASK-01-01
- Mitigation: Iterative template testing with real Agent feedback and version control
- **Risk**: Performance degradation with large specification documents
- Affected Tasks: TASK-02-01, TASK-02-02
- Mitigation: Implement caching strategies and optimize parsing algorithms
- **Risk**: Traceability accuracy issues with complex cross-references
- Affected Tasks: TASK-02-02, TASK-03-01
- Mitigation: Comprehensive test coverage and validation rule refinement
- **Risk**: MCP integration compatibility issues
- Affected Tasks: TASK-04-01
- Mitigation: Early integration testing and FastMCP framework adherence