City and County of San Francisco Edwin M. Lee, Mayor
Department of Building Inspection Tom C. Hui, S.E., C.B.O., Director
INFORMATION SHEET
NO. 5-04
DATE : June 22, 2015
CATEGORY Structural
SUBJECT Demolition Permits
PURPOSE : To carry out the safety requirements of the Building Code and to expedite
processing of permit applications for the demolition of buildings.
REFERENCE San Francisco Building Code Sections 106A.3.2.2, 1705.18 and 3303
AB-032 Site Permit Processing
AB-036 Special Inspection for Demolition Work Ordinance No. 27-06:
Construction and Demolition Debris Recovery Program
DBI Cost Schedule
DISCUSSION
(AI General Procedures
To demolish the entire building to the foundation will require a demolition permit (Form 6).
To demolish part of the building will not require a demolition permit, but will require a building permit
(Form 3/8).
For a site permit to remodel an existing building, no demolition permit is required.
For a site permit to construct a new building on a vacant space of a lot, no demolition permit is required.
Site permit application to construct a new building on a space occupied by an existing building
and demolition permit shall be filed at the same time, unless both new and existing buildings are
nonresidential or mixed use. (Note: Mixed use is a project combining nonresidential and residential uses)
For nonresidential or mixed use projects, site permit application to construct a new building on a space
occupied by an existing building may be issued if demolition permit had been filed. However, no addenda
for construction of a new building on a space occupied by an existing building shall be issued unless the
demolition permit had been issued.
For residential projects, site permit application to construct a new building on a space occupied by an
existing building needs to be issued at the same time as demolition permit.
Page 1 of 7
Technical Services Division
1660 Mission Street - San Francisco CA 94103
Office (415) 558-6205 - FAX (415) 558-6401 - www.sfdbi.org
=== PAGE 2 ===
INFORMATION SHEET S-04
(B) Demolition Plans - Details
Except for buildings ofType V construction and Type I, II, III and IV buildings less than 3 stories or 25 feet
in height shall provide Items 1, 2 and 3 as set forth herein below prior to approval of any application for
demolition permit.
1. Applicant shall submit two sets of detailed plans showing the following:
(a) The sequence of operation floor by floor,
(b) Location of standpipes,
(c) Location and details of protective canopy,
(d) Location of truck crane during operation,
(e) Any necessary fence or barricade with lights,
(f) Any floor or wall left standing, and
(g) Schedule of the days when the demolition will be done; i.e., on weekdays or on Sundays.
2. Applicant shall designate the party responsible for repairing any structural sidewalk slabs that may be
damaged during operation.
3. Applicant shall designate the responsible registered Civil Engineer or Architect who will supervise the
demolition work.
4. Applicant shall secure appropriate permits for use of street space, at the time of filing the demolition
permit.
5. Any wall or other construction to be left standing must be certified for structural stability by a
registered Civil Engineer, and must be so shown on submitted plans.
6. Demolition contractor shall notify the District Building Inspector at least two days prior to the
commencement of demolition operation. Demolition contract shall also notify SFE at (415)355-3700.
7. A registered Civil Engineer or Licensed Architect shall continuously and personally supervise the
demolition work and shall submit progress reports to the Director of the Department of Building
Inspection in writing.
8. Any of the aforementioned requirements may be waived only upon the written approval of the Director
of the Department of Building Inspection after receiving certification by the registered Civil Engineer
or record that the safety requirements of the Building Code are not lessened.
(e) Demolitions Permit Processing
Contractors seeking approval for demolition shall, in addition to other City department sign-ofts, provide
the following:
1. BAAQMD "J" number (obtained by calling 771-6000, ext. 217)
2. Asbestos/RACM survey supported by preparer's CAL OSHA certification
3. Form 3/8 application completed by licensed asbestos handling contractor when survey indicates the
presence of asbestos
Page 2 of 7
=== PAGE 3 ===
INFORMATION SHEET S-04
4. Two sets of mailing list for demolition to CPB to comply with the notification requirement per
San Francisco Building Code Section 103A3.2.2.1 (due upon filing of demolition permit).
Applications not complying with items 1 - 4 above shall not be accepted for review without prior
arrangements.
5. Demolition Debris Recovery Plan (DDRP) approved by the San Francisco Department of
Environment (SFE).
NOTES:
(a) The DDRP shall be prepared by person conducting demolition and shall demonstrate how the
project will divert Construction & Demolition (C&D) debris material from landfill.
(b) Applicant shall submit the DDRP to SFE for review after Planning approved the Site Permit.
(c) Demolition permit application number needs to be on the DDRP.
No demolition permit should be issued without an approved DDRP for that permit number, as required
by Ordinance 27-06.
Note: Link to SFE's Construction & Demolition webpage is http://www.sfenvironment.org/c&d
Page 3 of 7
=== PAGE 4 ===
INFORMATION SHEET S-04
DEMOLITION PERMIT PROCESSING FLOW CHART (See Section C):
(Exception applies to unsafe building per San Francisco Building Code Section 102A.16)
FINAL INSPECTION
Pending Special Inspection
Demolition Permit Application clearance letter
Received Form #6 Re: Asbestos cleanup and
completion of RACM removal
under Form 3 permit
BAAQMD "JII Process Received
DCP Approval Received
Route to CPB
Asbestos Report Indicates
DDRP Approval Received for Issuance
No "RACM"
Asbestos Report Received
"RACM"
Asbestos Report
Indicates (fRACM"
Form #3/8 for
IIRACM" Removal
Under Special Inspection
or Report
"RACM" - Regulated
Asbestos Containing
Materials
Page 4 of 7
=== PAGE 5 ===
INFORMATION SHEET 8-04
(D) Demolition Cost
1. BLDG Form 6: Application for Demolition Permit
Applicant shall write the estimated cost of demolition of building on the form.
Plan Reviewer would verify the cost by the following procedures.
2. Building Volume
=
Length of Building X Width of Building X Height of Building
=
Ground Floor Area X Height of Building
,
,
Height ,
of ---------------------~ , ,
,
''',
Building ,
''' .. "
Ground
Floor Area
Length
of
Building
Width of
Building
3. Average Unit Cost of Demolition of Building:
For average unit cost per cubic yard of building volume, see latest OBI Cost Schedule.
4. Cost of Demolition of Building = Building Volume X Unit Cost
Other conditions will be evaluated on a case-by-case basis by the Supervisor or Manager, subject to
written approval by Planning if required.
rJc- t/--VV/lf
1M'e
( L 7
I
Tom C. Hui, S.E., C.B.O. Date
Director
Department of Building Inspection
This Information Sheet is subject to modification at any time. For the most current version, visit our website
at http://www.sfdbi.org
Page 5 of 7
=== PAGE 6 ===
INFORMATION SHEET S-04
SF Environment
Our t.om.. 0... elry. Our plo" ...
DEMOLITION DEBRIS RECOVERY PLAN
WORKSHEET
Constmction and Demolition (C&D) Debris Recovery Program
City and County of San Francisco
Environment Code Chapter 14; Ordinance No. 27-06; SFE Regulations 06-05-CDO
PLAN TYPE: o NEW PERMIT APPLICATION o FINAL REPORT
DATE DEMO COMPLETED _ _ ___
General Instructions:
• Demolition Debris Recovety Plan (DDRP) WORKSHEET must be completed by person conducting demolition and
submitted to San Francisco's Department of Environment (SFE) for all Department of Building Inspection (OBI) Full
Demolition Permit applications (Form #6). Submit to SFE at address or fax at bottom of this page.
• The DDRP must demonstrate that the demolition project will achieve a minimum of 65% diversion from landfill.
Mixed C&D debris material taken to a San Francisco Registered C&D Facility will be credited at 65% diversion.
No C&D debris material can be taken directly to landfill or be put in garbage.
• After SFE approves the DDRP, it will be returned to you to submit to OBI before issuance of the Demolition Permit.
Detailed instructions for completing a final report will be included with the approved DDRP.
• Demolition permits will not be issued by OBI without an approved DDRP.
• A FINAL REPORT MUST BE SUBMITTED WITHIN 30 DAYS AFTER COMPLETION OF DEMOLITION.
Demolition Permit Application No. _ _ ___________ Permit Application Date ______ _
Project Address Project BlocklLot#_ ________
Demolition Permit Applicant ____ _ ______ ___ Phone ( ) ___________
Demolition Permit Applicant Address ____ _ ___ _ _________ __________
ContactName ____________________ Phone <--J_ __ ____ _____
Contact Address Fax L)
(ifdifferelllJi"olll abo-ve-,,y- ----------------- '------------ -
_ _ _ ________ _ __________ E-Mail _ _ _ _ ______ _ _
Describe building being demolished: Type ____________ Square Footage _ _ _ _____
Complete the Diversion Rate Table on the reverse side of this worksheet indicating the disposition by material type of all
project materials. See www.sfenvironment.orglc&d for possible facilities or markets to take materials. For new permit
applications, provide ESTIMATED tons. For final reports, provide ACTUAL tons based on receipts you have received
from facilities. Information included in the final repOlt is subject to verification by SFE.
Instmctions for completing the table on the reverse side of this worksheet; all materials are repOIted in TONS
Column I - This is the total tons of materials generated liOln this project listed by material type;
Column 2- Materials that will be separated on site in usable condition taken to a salvage facility for reuse. Also
includes materials reused on site such as wood fOlms, and inerts used as backfill, etc.
Column 3 - Materials separated on site that will be taken to a facility to be reprocessed into a new product. This
includes source separated materials such as wood, metal, cardboard, drywall, landscape debris, etc.
Column 4 - Materials that are not source-separated on site and are taken to a San Francisco Registered C&D Facility
that will process mixed C&D materials for recovery. Mixed C&D materials taken to a SF-Registered C&D
Debris Facility will be credited with 65% diversion. A list of Registered Facilities can be found at
sfenvironment.orglc&d
Column 5- SOIted, Non-Recyclable, Non-Compostable Debris hauled to landfill; MUST DESCRIBE.
Column 6 - Name of facility(s) you intend to use for reuse, recycling or disposal of each material generated from the
project.
Submittal Instructions: Submit this completed and signed form to: Department of the Environment, 1455 Market
Street, #1200., San Francisco, CA 94103. Attention: C&D Demolition Debris Recovery Plan. Fax: 415.554.6393
For questions, please call SFE at (415) 355-3700 or see www.sfenvironment.org/c&d
Page 6 of 7.
=== PAGE 7 ===
INFORMATION SHEET 8-04
Diversion Rate Table (See Instructions on.t he front side of this form for column descriptions).
3 4
Material I 2 Recycling MixedC&D 5 6
Type (Toils) Total Tons Salvage or (source- Debris to Landfill Facility or Destillation
Generated Reuse separated Registered Disposal
material) Facility *
Example: Wood 50 5 45 Building ResourceslSFR&D
Wood, Pallets & Lumber
(clean & unpainted, no pressure
treated wood)
Cabinets, Fixtures, Doors,
Windows, Equipment
Metal
Carpet
Carpet Padding
Cardboard
Ceiling Tile
Drywall (used and painted)
Green Waste
Concrete
Asphalt
Brick, Masonry, Tile
RocklDirtiSoil
MlXED DEBRIS
Other (please specify)
Sorted, NOli-Recyclable,
Non-Compostable Debris
(please describe)
TOTALS A 13 C D*
D
Calculate Yom' Diversion Rate using the following formula:
~ ~ I I ~D ~ ~ I~O
+ + D X ,65 (DR» Divide L-YO_lf_D_iv_eSri_o_"_R._,e-, %
[* Mixed C&D material designated for processing at a SF-Registered Mixed Debris Facility will be considered diverted
at 65% diversion rate (pursuant to Ordinance No. 27-06).]
If Your Diversion Rate is less that 65%, provide justification why the project cmmot meet the 65% diversion requirement
List haulers removing material off site (use extra page ijnecessmy). Use only Registered Transporters for Mixed Debris.
I) 2) 3)_ _________
J AGREE TO SUBMIT A FINAL REPORT for this Demolition Permit WITHIN 30 DAYS AFTER COMPLETION OF THE
DEMOLITION PROJECT; FINAL REPORT MUST VERIFY THE ACTUAL DIVERSION ACHIEVED & INCLUDE ALL
RECEIPTS FROM FACILITIES, ESTIMATED DATE OF COMPLETION: __________
Submitted by (signalufc): __- ---------------~Date.-------------~
Print Name Title._ ______ ______
~
FOR OFFICIAL CITY USE ONLY
DATE PLAN/REPORT RECEIVED BY SFE __________
APPROVED __________ NOT APPROVED ______ _ _ _ DATE _ ________
~
COMMENTS ___________________________ _ _______
APPROVED BY ___________________ NAME & TITLE,_ _____ _ ______ _
Page 7 of 7