"meta": {
"source": "2022-NRCC-CXR-E-NonresidentialBuildingCommissioning.pdf",
"title": "Nonresidential Building Commissioning (CXR-E)",
"authority": "California Energy Commission — 2022 Energy Code (Title 24, Part 6)",
"form_id": "NRCC-CXR-E",
"effective": "2023-01-01",
"last_reviewed": "2026-02-15",
"knowledge_tier": 1,
"relevance": "Required for all nonresidential new construction and major alterations; common correction trigger when missing or incomplete"
},
"overview": {
"description": "The NRCC-CXR-E is the Certificate of Compliance for nonresidential building commissioning (Cx) under the 2022 California Energy Code. It documents that building systems have been designed to enable proper commissioning and that a commissioning plan is in place.",
"when_required": [
"All new nonresidential buildings",
"Major alterations to nonresidential buildings where HVAC or lighting systems are substantially modified",
"Mixed-use buildings (nonresidential portions)",
"High-rise residential buildings (>3 stories above grade)"
],
"who_completes": "Design professional of record (architect or engineer) responsible for the systems being commissioned",
"submission_timing": "Submitted with building permit application as part of the NRCC package; updated versions may be required at plan check corrections",
"related_forms": [
{"form": "NRCC-PRF-01-E", "description": "Performance compliance approach — overall building energy model"},
{"form": "NRCA-LTI-04-E", "description": "Acceptance test for lighting controls"},
{"form": "NRCA-MCH-04-E", "description": "Acceptance test for HVAC systems"},
{"form": "NRCI-CXR-E", "description": "Installation certificate for commissioning (field verification)"}
]
},
"commissioning_requirements": {
"design_phase": {
"description": "Requirements that must be documented during design/permit application phase",
"items": [
{
"id": "CX-D01",
"requirement": "Commissioning plan",
"detail": "Written plan identifying systems to be commissioned, testing procedures, schedule, and responsible parties",
"common_correction": "Missing or incomplete commissioning plan is one of the top 5 nonresidential plan check corrections"
},
{
"id": "CX-D02",
"requirement": "Owner's Project Requirements (OPR)",
"detail": "Document stating the owner's functional requirements for building systems, including energy efficiency goals"
},
{
"id": "CX-D03",
"requirement": "Basis of Design (BOD)",
"detail": "Document describing the design approach for meeting the OPR, including system descriptions and design criteria"
},
{
"id": "CX-D04",
"requirement": "Commissioning specifications",
"detail": "Technical specifications included in the construction documents describing commissioning procedures for each system"
},
{
"id": "CX-D05",
"requirement": "Design review documentation",
"detail": "Narrative describing how the design achieves the commissioning requirements of the energy code"
}
]
},
"construction_phase": {
"description": "Requirements during construction and pre-occupancy",
"items": [
{
"id": "CX-C01",
"requirement": "Functional performance testing",
"detail": "Systematic testing of each commissioned system under various operating conditions (full load, part load, failure modes)"
},
{
"id": "CX-C02",
"requirement": "Commissioning report",
"detail": "Final report documenting all test results, deficiencies found, corrections made, and system performance verification"
},
{
"id": "CX-C03",
"requirement": "Training documentation",
"detail": "Evidence that building operations staff received training on commissioned systems"
}
]
}
},
"systems_requiring_commissioning": {
"hvac": {
"description": "Heating, ventilation, and air conditioning systems",
"applicable_when": "All new HVAC systems in nonresidential buildings",
"commissioning_items": [
{
"system": "Air handling units (AHU)",
"tests": ["Airflow verification", "Outside air damper operation", "Economizer control sequence", "Supply air temperature reset", "Fan power/VFD verification"]
},
{
"system": "Variable air volume (VAV) terminals",
"tests": ["Minimum/maximum airflow setpoints", "Zone temperature control", "Reheat valve operation", "Damper stroke verification"]
},
{
"system": "Packaged/split systems",
"tests": ["Thermostat operation", "Economizer functionality", "Fault detection diagnostics", "Refrigerant charge verification"]
},
{
"system": "Boilers and chillers",
"tests": ["Equipment staging", "Temperature reset schedules", "Safety controls", "Efficiency verification at part load"]
},
{
"system": "Exhaust systems",
"tests": ["Airflow measurement", "Demand control ventilation (DCV)", "Kitchen hood controls", "Garage CO sensor integration"]
},
{
"system": "Controls and DDC/BAS",
"tests": ["Schedule verification", "Setpoint optimization", "Alarm functionality", "Network communication", "Trend logging setup"]
}
]
},
"lighting_controls": {
"description": "Lighting control systems",
"applicable_when": "All new lighting systems in nonresidential buildings",
"commissioning_items": [
{
"system": "Occupancy/vacancy sensors",
"tests": ["Sensor coverage verification", "Time delay settings", "Override functionality", "Integration with HVAC"]
},
{
"system": "Daylight harvesting",
"tests": ["Photosensor calibration", "Dimming response curves", "Setpoint verification", "Window management integration"]
},
{
"system": "Demand response",
"tests": ["Signal reception", "Load shed levels", "Recovery timing", "Override procedures"]
},
{
"system": "Scheduling controls",
"tests": ["Time clock programming", "Holiday/weekend schedules", "Sweep-off timing", "Manual override duration"]
},
{
"system": "Automatic daylighting controls",
"tests": ["Primary sidelit zone dimming", "Secondary sidelit zone dimming", "Toplighting zone dimming", "Calibration under varying sky conditions"]
}
]
},
"domestic_hot_water": {
"description": "Service water heating systems",
"applicable_when": "Systems serving nonresidential occupancies",
"commissioning_items": [
{
"system": "Water heaters and boilers",
"tests": ["Temperature setpoint verification", "Recirculation pump controls", "Timer/sensor operation"]
},
{
"system": "Solar thermal systems",
"tests": ["Collector orientation/tilt", "Pump controls", "Freeze protection", "Integration with backup heating"]
}
]
},
"building_envelope": {
"description": "Envelope-related commissioning (advanced commissioning only)",
"applicable_when": "Projects pursuing advanced commissioning or where envelope performance is critical",
"commissioning_items": [
{
"system": "Air barrier systems",
"tests": ["Blower door testing", "Pressure differential verification", "Joint/seal inspection"]
}
]
}
},
"advanced_commissioning": {
"description": "Enhanced commissioning requirements that go beyond basic code compliance",
"when_triggered": [
"Buildings over 10,000 sq ft conditioned area",
"Buildings with complex HVAC systems (multiple zones, central plant)",
"Projects claiming energy credits for advanced commissioning"
],
"additional_requirements": [
{
"id": "ACX-01",
"requirement": "Monitoring-based commissioning (MBCx)",
"detail": "Post-occupancy energy monitoring system capable of measuring whole-building energy use and major end uses, with fault detection and diagnostics"
},
{
"id": "ACX-02",
"requirement": "Independent commissioning agent",
"detail": "Commissioning conducted by an independent agent not on the design or construction team"
},
{
"id": "ACX-03",
"requirement": "Seasonal testing",
"detail": "Functional testing under both heating and cooling conditions (may require return visit)"
},
{
"id": "ACX-04",
"requirement": "Systems manual",
"detail": "Comprehensive operating manual for all commissioned systems including sequences of operation, maintenance schedules, and troubleshooting guides"
}
]
},
"common_corrections": [
{
"id": "CXR-C01",
"category": "Missing documentation",
"description": "Commissioning plan not included with permit application",
"frequency": "Very common — top 3 nonresidential correction",
"resolution": "Submit complete commissioning plan per Section 120.8 requirements",
"timeline_impact_days": 14
},
{
"id": "CXR-C02",
"category": "Incomplete scope",
"description": "Commissioning plan does not cover all required systems (often missing lighting controls or DHW)",
"frequency": "Common",
"resolution": "Expand commissioning plan to include all systems per Tables 120.8-A and 120.8-B",
"timeline_impact_days": 7
},
{
"id": "CXR-C03",
"category": "Missing design review",
"description": "Design review narrative not provided or does not address energy code compliance",
"frequency": "Common",
"resolution": "Provide design review narrative addressing OPR, BOD, and code requirements",
"timeline_impact_days": 7
},
{
"id": "CXR-C04",
"category": "No commissioning agent identified",
"description": "Commissioning plan does not identify the responsible commissioning professional",
"frequency": "Moderate",
"resolution": "Identify commissioning agent with qualifications per Section 120.8(a)",
"timeline_impact_days": 3
},
{
"id": "CXR-C05",
"category": "Acceptance test forms missing",
"description": "Required NRCA acceptance test forms not referenced or included in commissioning plan",
"frequency": "Common",
"resolution": "Include applicable NRCA forms (LTI-04, MCH-04, etc.) and identify when each will be completed",
"timeline_impact_days": 5
},
{
"id": "CXR-C06",
"category": "CXR-E form not submitted",
"description": "NRCC-CXR-E compliance certificate not included in the Title 24 documentation package",
"frequency": "Very common",
"resolution": "Complete and submit NRCC-CXR-E signed by design professional of record",
"timeline_impact_days": 3
}
],
"sf_specific_notes": [
{
"topic": "DBI plan check",
"detail": "San Francisco DBI reviews commissioning documentation during M-06 (Mechanical) and M-08 (Energy) plan check stages. Missing CXR-E is flagged as a correction that holds permit issuance."
},
{
"topic": "AB-093 green building overlay",
"detail": "SF's green building ordinance (AB-093) may require commissioning beyond Title 24 minimums for new construction and major alterations, including enhanced commissioning per LEED or GreenPoint Rated requirements."
},
{
"topic": "Inspection coordination",
"detail": "Functional performance tests for HVAC and lighting controls must be witnessed by a DBI inspector or approved third-party. Schedule through the DBI online inspection request system."
},
{
"topic": "Certificate of Final Completion",
"detail": "Commissioning report and acceptance test results must be provided before DBI issues Certificate of Final Completion. Green Building Final Compliance form (AB-093 Attachment E) is also required for applicable projects."
}
],
"tool_integration": {
"required_documents": {
"triggers": ["nonresidential_new_construction", "major_alteration_nonresidential", "title24", "commercial_ti", "green_building"],
"documents_to_add": [
"NRCC-CXR-E (Commissioning Certificate of Compliance)",
"Commissioning plan per Section 120.8",
"Owner's Project Requirements (OPR)",
"Basis of Design (BOD)",
"Design review narrative"
]
},
"revision_risk": {
"triggers": ["nonresidential_new_construction", "major_alteration_nonresidential", "title24"],
"risk_factors": [
"Missing commissioning plan (CXR-C01): +14 days",
"Incomplete system coverage (CXR-C02): +7 days",
"Missing CXR-E form (CXR-C06): +3 days"
]
},
"estimate_timeline": {
"note": "Projects requiring commissioning typically add 1-3 weeks to the overall permit timeline due to plan check review of Cx documentation and potential corrections"
}
}
}