02-strategy.mdβ’4.36 kB
# Test Strategy & Priority Framework
> **Context:** Comprehensive testing methodology with priority-based execution approach
> **Prerequisites:** [Overview](./01-overview.md) - Understanding of testing objectives and scope
> **Next Steps:** [Execution Process](./03-execution.md) or [Test Cases](./04-test-cases/)
## Test Strategy
This document outlines the systematic approach for testing the Attio MCP Server using a priority-based framework with quality gates to ensure efficient validation and clear go/no-go decisions.
### Priority Framework
Tests are organized in three priority levels with specific success criteria:
| Priority | Tools | Success Rate | Duration | Quality Gate |
|----------|-------|--------------|----------|-------------|
| **P0 - Core** β‘ | CRUD operations | 100% (5/5) | 2 hours | MANDATORY |
| **P1 - Essential** π§ | Attributes, advanced search | 80% (3/4) | 2 hours | PRODUCTION GATE |
| **P2 - Advanced** π | Relationships, batch ops | 50% (3/5) | 2 hours | ENHANCEMENT |
#### Quality Gates Decision Matrix
**Quality Gates:**
- **P0 failure** = STOP testing (system not ready)
- **P1 <80%** = Evaluate production readiness
- **P2 <50%** = Document but don't block release
### Priority Level Definitions
#### Priority 0 (P0) - Core Foundation β‘
**Critical Success Factor:** MANDATORY
**Success Criteria:** 100% of P0 tests must PASS (5/5)
**Duration:** Maximum 2 hours
**Tools Covered:**
- Search Records (basic functionality)
- Get Record Details (data retrieval)
- Create Records (data creation)
- Update Records (data modification)
- Delete Records (data removal)
**Decision Point:** If P0 fails, STOP - system not ready for testing
#### Priority 1 (P1) - Essential Extensions π§
**Critical Success Factor:** PRODUCTION GATE
**Success Criteria:** Minimum 80% pass rate (3/4 tests)
**Duration:** Maximum 2 hours
**Tools Covered:**
- Get Attributes (schema discovery)
- Discover Attributes (dynamic exploration)
- Get Detailed Info (specific data types)
- Advanced Search (complex filtering)
**Decision Point:** If <80% pass rate, evaluate production readiness
#### Priority 2 (P2) - Advanced Features π
**Critical Success Factor:** ENHANCEMENT
**Success Criteria:** Minimum 50% pass rate (3/5 tests)
**Duration:** Maximum 2 hours
**Tools Covered:**
- Search by Relationship (connected data)
- Search by Content (content-based queries)
- Search by Timeframe (temporal filtering)
- Batch Operations (bulk processing)
- Batch Search (parallel queries)
**Decision Point:** Nice-to-have features, don't block release
### Testing Phases
#### Phase 1: Functional Testing
- **Executor:** Technical agent (familiar with system architecture)
- **Focus:** Core functionality validation and technical correctness
- **Duration:** 6 hours maximum (2 hours per priority level)
- **Objective:** Validate that all tools work as designed and handle expected scenarios
**Execution Order:**
1. **Setup Phase** (30 minutes): Prepare test data, verify environment
2. **P0 Core Testing** (2 hours): Must achieve 100% pass rate
3. **P1 Essential Testing** (2 hours): Target 80% pass rate
4. **P2 Advanced Testing** (1.5 hours): Target 50% pass rate
#### Phase 2: Usability Testing
- **Executor:** Fresh agent (unfamiliar with system - simulates new user)
- **Focus:** Documentation clarity, parameter understanding, and user experience
- **Duration:** 2-3 hours estimated
- **Objective:** Identify documentation gaps and parameter confusion that could affect real users
**Focus Areas:**
- Parameter clarity and intuitive naming
- Error message helpfulness and actionability
- Documentation completeness and accuracy
- Edge case handling and graceful degradation
### Success Metrics Summary
| Phase | Executor | Duration | Success Criteria | Quality Gate |
|-------|----------|----------|------------------|-------------|
| **Phase 1** | Technical Agent | 6 hours | P0: 100%, P1: 80%, P2: 50% | Production Readiness |
| **Phase 2** | Fresh Agent | 2-3 hours | Clear documentation, intuitive usage | User Experience |
---
**Related Documentation:**
- [Previous: Overview & Objectives](./01-overview.md)
- [Next: Execution Process & Workflow](./03-execution.md)
- [Reference: Test Cases Details](./04-test-cases/)
- [Reference: Quality Gates & Decision Criteria](./05-quality-gates.md)