IEEE123Master.dss•17 kB
! Annotated Master file for the IEEE 123-bus test case.
!
! This file is meant to be invoked from the Compile command in the "Run_IEEE123Bus.DSS" file.
!
! Note: DSS commands, property names, etc., are NOT case sensitive. Capitalize as you please.
! You should always do a "Clear" before making a new circuit:
Clear
Set DefaultBaseFrequency=60
! INSTANTIATE A NEW CIRCUIT AND DEFINE A STIFF 4160V SOURCE
! The new circuit is called "ieee123"
! This creates a Vsource object connected to "sourcebus". This is now the active circuit element, so
! you can simply continue to edit its property value.
! The basekV is redefined to 4.16 kV. The bus name is changed to "150" to match one of the buses in the test feeder.
! The source is set for 1.0 per unit and the Short circuit impedance is set to a small value (0.0001 ohms)
! The ~ is just shorthad for "more" for the New or Edit commands
New object=circuit.ieee123
~ basekv=4.16 Bus1=150 pu=1.00 R1=0 X1=0.0001 R0=0 X0=0.0001
! 3-PHASE GANGED REGULATOR AT HEAD OF FEEDER (KERSTING ASSUMES NO IMPEDANCE IN THE REGULATOR)
! the first line defines the 3-phase transformer to be controlled by the regulator control.
! The 2nd line defines the properties of the regulator control according to the test case
new transformer.reg1a phases=3 windings=2 buses=[150 150r] conns=[wye wye] kvs=[4.16 4.16] kvas=[5000 5000] XHL=.001 %LoadLoss=0.00001 ppm=0.0
new regcontrol.creg1a transformer=reg1a winding=2 vreg=120 band=2 ptratio=20 ctprim=700 R=3 X=7.5
! REDIRECT INPUT STREAM TO FILE CONTAINING DEFINITIONS OF LINECODES
! This file defines the line impedances is a similar manner to the description in the test case.
Redirect IEEELineCodes.DSS
! LINE DEFINITIONS
! Lines are defined by referring to a "linecode" that contains the impedances per unit length
! So the only properties required are the LineCode name and Length. Units are assumed to match the definition
! since no units property is defined in either the Linecodes file or this file.
! Note that it is not necessary to explicitly specify the node connections for the 3-phase lines
! unless they are not ".1.2.3". However, they are spelled out here for clarity.
! The DSS assumes .1.2.3.0.0 ... for connections of 3 or more phases.
! Likewise, .1 is not necessary for 1-phase lines connected to phase 1. However, if it is connected
! to any other phase, it must be specified. For completeness, everything is spelled out here.
!
! Note that it is recommended that the "units=" property be used here and in the Linecode definition as well
! to avoid confusion in the future
! *** Original *** New Line.L115 Phases=3 Bus1=149.1.2.3 Bus2=1.1.2.3 LineCode=1 Length=0.4
! Since the default is 3-phase, the definition of this line can be simpler:
New Line.L115 Bus1=149 Bus2=1 LineCode=1 Length=0.4 units=kft
New Line.L1 Phases=1 Bus1=1.2 Bus2=2.2 LineCode=10 Length=0.175 units=kft
New Line.L2 Phases=1 Bus1=1.3 Bus2=3.3 LineCode=11 Length=0.25 units=kft
New Line.L3 Phases=3 Bus1=1.1.2.3 Bus2=7.1.2.3 LineCode=1 Length=0.3 units=kft
New Line.L4 Phases=1 Bus1=3.3 Bus2=4.3 LineCode=11 Length=0.2 units=kft
New Line.L5 Phases=1 Bus1=3.3 Bus2=5.3 LineCode=11 Length=0.325 units=kft
New Line.L6 Phases=1 Bus1=5.3 Bus2=6.3 LineCode=11 Length=0.25 units=kft
New Line.L7 Phases=3 Bus1=7.1.2.3 Bus2=8.1.2.3 LineCode=1 Length=0.2 units=kft
New Line.L8 Phases=1 Bus1=8.2 Bus2=12.2 LineCode=10 Length=0.225 units=kft
New Line.L9 Phases=1 Bus1=8.1 Bus2=9.1 LineCode=9 Length=0.225 units=kft
New Line.L10 Phases=3 Bus1=8.1.2.3 Bus2=13.1.2.3 LineCode=1 Length=0.3 units=kft
New Line.L11 Phases=1 Bus1=9r.1 Bus2=14.1 LineCode=9 Length=0.425 units=kft
New Line.L12 Phases=1 Bus1=13.3 Bus2=34.3 LineCode=11 Length=0.15 units=kft
New Line.L13 Phases=3 Bus1=13.1.2.3 Bus2=18.1.2.3 LineCode=2 Length=0.825 units=kft
New Line.L14 Phases=1 Bus1=14.1 Bus2=11.1 LineCode=9 Length=0.25 units=kft
New Line.L15 Phases=1 Bus1=14.1 Bus2=10.1 LineCode=9 Length=0.25 units=kft
New Line.L16 Phases=1 Bus1=15.3 Bus2=16.3 LineCode=11 Length=0.375 units=kft
New Line.L17 Phases=1 Bus1=15.3 Bus2=17.3 LineCode=11 Length=0.35 units=kft
New Line.L18 Phases=1 Bus1=18.1 Bus2=19.1 LineCode=9 Length=0.25 units=kft
New Line.L19 Phases=3 Bus1=18.1.2.3 Bus2=21.1.2.3 LineCode=2 Length=0.3 units=kft
New Line.L20 Phases=1 Bus1=19.1 Bus2=20.1 LineCode=9 Length=0.325 units=kft
New Line.L21 Phases=1 Bus1=21.2 Bus2=22.2 LineCode=10 Length=0.525 units=kft
New Line.L22 Phases=3 Bus1=21.1.2.3 Bus2=23.1.2.3 LineCode=2 Length=0.25 units=kft
New Line.L23 Phases=1 Bus1=23.3 Bus2=24.3 LineCode=11 Length=0.55 units=kft
New Line.L24 Phases=3 Bus1=23.1.2.3 Bus2=25.1.2.3 LineCode=2 Length=0.275 units=kft
New Line.L25 Phases=2 Bus1=25r.1.3 Bus2=26.1.3 LineCode=7 Length=0.35 units=kft
New Line.L26 Phases=3 Bus1=25.1.2.3 Bus2=28.1.2.3 LineCode=2 Length=0.2 units=kft
New Line.L27 Phases=2 Bus1=26.1.3 Bus2=27.1.3 LineCode=7 Length=0.275 units=kft
New Line.L28 Phases=1 Bus1=26.3 Bus2=31.3 LineCode=11 Length=0.225 units=kft
New Line.L29 Phases=1 Bus1=27.1 Bus2=33.1 LineCode=9 Length=0.5 units=kft
New Line.L30 Phases=3 Bus1=28.1.2.3 Bus2=29.1.2.3 LineCode=2 Length=0.3 units=kft
New Line.L31 Phases=3 Bus1=29.1.2.3 Bus2=30.1.2.3 LineCode=2 Length=0.35 units=kft
New Line.L32 Phases=3 Bus1=30.1.2.3 Bus2=250.1.2.3 LineCode=2 Length=0.2 units=kft
New Line.L33 Phases=1 Bus1=31.3 Bus2=32.3 LineCode=11 Length=0.3 units=kft
New Line.L34 Phases=1 Bus1=34.3 Bus2=15.3 LineCode=11 Length=0.1 units=kft
New Line.L35 Phases=2 Bus1=35.1.2 Bus2=36.1.2 LineCode=8 Length=0.65 units=kft
New Line.L36 Phases=3 Bus1=35.1.2.3 Bus2=40.1.2.3 LineCode=1 Length=0.25 units=kft
New Line.L37 Phases=1 Bus1=36.1 Bus2=37.1 LineCode=9 Length=0.3 units=kft
New Line.L38 Phases=1 Bus1=36.2 Bus2=38.2 LineCode=10 Length=0.25 units=kft
New Line.L39 Phases=1 Bus1=38.2 Bus2=39.2 LineCode=10 Length=0.325 units=kft
New Line.L40 Phases=1 Bus1=40.3 Bus2=41.3 LineCode=11 Length=0.325 units=kft
New Line.L41 Phases=3 Bus1=40.1.2.3 Bus2=42.1.2.3 LineCode=1 Length=0.25 units=kft
New Line.L42 Phases=1 Bus1=42.2 Bus2=43.2 LineCode=10 Length=0.5 units=kft
New Line.L43 Phases=3 Bus1=42.1.2.3 Bus2=44.1.2.3 LineCode=1 Length=0.2 units=kft
New Line.L44 Phases=1 Bus1=44.1 Bus2=45.1 LineCode=9 Length=0.2 units=kft
New Line.L45 Phases=3 Bus1=44.1.2.3 Bus2=47.1.2.3 LineCode=1 Length=0.25 units=kft
New Line.L46 Phases=1 Bus1=45.1 Bus2=46.1 LineCode=9 Length=0.3 units=kft
New Line.L47 Phases=3 Bus1=47.1.2.3 Bus2=48.1.2.3 LineCode=4 Length=0.15 units=kft
New Line.L48 Phases=3 Bus1=47.1.2.3 Bus2=49.1.2.3 LineCode=4 Length=0.25 units=kft
New Line.L49 Phases=3 Bus1=49.1.2.3 Bus2=50.1.2.3 LineCode=4 Length=0.25 units=kft
New Line.L50 Phases=3 Bus1=50.1.2.3 Bus2=51.1.2.3 LineCode=4 Length=0.25 units=kft
New Line.L51 Phases=3 Bus1=51.1.2.3 Bus2=151.1.2.3 LineCode=4 Length=0.5 units=kft
New Line.L52 Phases=3 Bus1=52.1.2.3 Bus2=53.1.2.3 LineCode=1 Length=0.2 units=kft
New Line.L53 Phases=3 Bus1=53.1.2.3 Bus2=54.1.2.3 LineCode=1 Length=0.125 units=kft
New Line.L54 Phases=3 Bus1=54.1.2.3 Bus2=55.1.2.3 LineCode=1 Length=0.275 units=kft
New Line.L55 Phases=3 Bus1=54.1.2.3 Bus2=57.1.2.3 LineCode=3 Length=0.35 units=kft
New Line.L56 Phases=3 Bus1=55.1.2.3 Bus2=56.1.2.3 LineCode=1 Length=0.275 units=kft
New Line.L57 Phases=1 Bus1=57.2 Bus2=58.2 LineCode=10 Length=0.25 units=kft
New Line.L58 Phases=3 Bus1=57.1.2.3 Bus2=60.1.2.3 LineCode=3 Length=0.75 units=kft
New Line.L59 Phases=1 Bus1=58.2 Bus2=59.2 LineCode=10 Length=0.25 units=kft
New Line.L60 Phases=3 Bus1=60.1.2.3 Bus2=61.1.2.3 LineCode=5 Length=0.55 units=kft
New Line.L61 Phases=3 Bus1=60.1.2.3 Bus2=62.1.2.3 LineCode=12 Length=0.25 units=kft
New Line.L62 Phases=3 Bus1=62.1.2.3 Bus2=63.1.2.3 LineCode=12 Length=0.175 units=kft
New Line.L63 Phases=3 Bus1=63.1.2.3 Bus2=64.1.2.3 LineCode=12 Length=0.35 units=kft
New Line.L64 Phases=3 Bus1=64.1.2.3 Bus2=65.1.2.3 LineCode=12 Length=0.425 units=kft
New Line.L65 Phases=3 Bus1=65.1.2.3 Bus2=66.1.2.3 LineCode=12 Length=0.325 units=kft
New Line.L66 Phases=1 Bus1=67.1 Bus2=68.1 LineCode=9 Length=0.2 units=kft
New Line.L67 Phases=3 Bus1=67.1.2.3 Bus2=72.1.2.3 LineCode=3 Length=0.275 units=kft
New Line.L68 Phases=3 Bus1=67.1.2.3 Bus2=97.1.2.3 LineCode=3 Length=0.25 units=kft
New Line.L69 Phases=1 Bus1=68.1 Bus2=69.1 LineCode=9 Length=0.275 units=kft
New Line.L70 Phases=1 Bus1=69.1 Bus2=70.1 LineCode=9 Length=0.325 units=kft
New Line.L71 Phases=1 Bus1=70.1 Bus2=71.1 LineCode=9 Length=0.275 units=kft
New Line.L72 Phases=1 Bus1=72.3 Bus2=73.3 LineCode=11 Length=0.275 units=kft
New Line.L73 Phases=3 Bus1=72.1.2.3 Bus2=76.1.2.3 LineCode=3 Length=0.2 units=kft
New Line.L74 Phases=1 Bus1=73.3 Bus2=74.3 LineCode=11 Length=0.35 units=kft
New Line.L75 Phases=1 Bus1=74.3 Bus2=75.3 LineCode=11 Length=0.4 units=kft
New Line.L76 Phases=3 Bus1=76.1.2.3 Bus2=77.1.2.3 LineCode=6 Length=0.4 units=kft
New Line.L77 Phases=3 Bus1=76.1.2.3 Bus2=86.1.2.3 LineCode=3 Length=0.7 units=kft
New Line.L78 Phases=3 Bus1=77.1.2.3 Bus2=78.1.2.3 LineCode=6 Length=0.1 units=kft
New Line.L79 Phases=3 Bus1=78.1.2.3 Bus2=79.1.2.3 LineCode=6 Length=0.225 units=kft
New Line.L80 Phases=3 Bus1=78.1.2.3 Bus2=80.1.2.3 LineCode=6 Length=0.475 units=kft
New Line.L81 Phases=3 Bus1=80.1.2.3 Bus2=81.1.2.3 LineCode=6 Length=0.175 units=kft
New Line.L82 Phases=3 Bus1=81.1.2.3 Bus2=82.1.2.3 LineCode=6 Length=0.25 units=kft
New Line.L83 Phases=1 Bus1=81.3 Bus2=84.3 LineCode=11 Length=0.675 units=kft
New Line.L84 Phases=3 Bus1=82.1.2.3 Bus2=83.1.2.3 LineCode=6 Length=0.25 units=kft
New Line.L85 Phases=1 Bus1=84.3 Bus2=85.3 LineCode=11 Length=0.475 units=kft
New Line.L86 Phases=3 Bus1=86.1.2.3 Bus2=87.1.2.3 LineCode=6 Length=0.45 units=kft
New Line.L87 Phases=1 Bus1=87.1 Bus2=88.1 LineCode=9 Length=0.175 units=kft
New Line.L88 Phases=3 Bus1=87.1.2.3 Bus2=89.1.2.3 LineCode=6 Length=0.275 units=kft
New Line.L89 Phases=1 Bus1=89.2 Bus2=90.2 LineCode=10 Length=0.25 units=kft
New Line.L90 Phases=3 Bus1=89.1.2.3 Bus2=91.1.2.3 LineCode=6 Length=0.225 units=kft
New Line.L91 Phases=1 Bus1=91.3 Bus2=92.3 LineCode=11 Length=0.3 units=kft
New Line.L92 Phases=3 Bus1=91.1.2.3 Bus2=93.1.2.3 LineCode=6 Length=0.225 units=kft
New Line.L93 Phases=1 Bus1=93.1 Bus2=94.1 LineCode=9 Length=0.275 units=kft
New Line.L94 Phases=3 Bus1=93.1.2.3 Bus2=95.1.2.3 LineCode=6 Length=0.3 units=kft
New Line.L95 Phases=1 Bus1=95.2 Bus2=96.2 LineCode=10 Length=0.2 units=kft
New Line.L96 Phases=3 Bus1=97.1.2.3 Bus2=98.1.2.3 LineCode=3 Length=0.275 units=kft
New Line.L97 Phases=3 Bus1=98.1.2.3 Bus2=99.1.2.3 LineCode=3 Length=0.55 units=kft
New Line.L98 Phases=3 Bus1=99.1.2.3 Bus2=100.1.2.3 LineCode=3 Length=0.3 units=kft
New Line.L99 Phases=3 Bus1=100.1.2.3 Bus2=450.1.2.3 LineCode=3 Length=0.8 units=kft
New Line.L118 Phases=3 Bus1=197.1.2.3 Bus2=101.1.2.3 LineCode=3 Length=0.25 units=kft
New Line.L100 Phases=1 Bus1=101.3 Bus2=102.3 LineCode=11 Length=0.225 units=kft
New Line.L101 Phases=3 Bus1=101.1.2.3 Bus2=105.1.2.3 LineCode=3 Length=0.275 units=kft
New Line.L102 Phases=1 Bus1=102.3 Bus2=103.3 LineCode=11 Length=0.325 units=kft
New Line.L103 Phases=1 Bus1=103.3 Bus2=104.3 LineCode=11 Length=0.7 units=kft
New Line.L104 Phases=1 Bus1=105.2 Bus2=106.2 LineCode=10 Length=0.225 units=kft
New Line.L105 Phases=3 Bus1=105.1.2.3 Bus2=108.1.2.3 LineCode=3 Length=0.325 units=kft
New Line.L106 Phases=1 Bus1=106.2 Bus2=107.2 LineCode=10 Length=0.575 units=kft
New Line.L107 Phases=1 Bus1=108.1 Bus2=109.1 LineCode=9 Length=0.45 units=kft
New Line.L108 Phases=3 Bus1=108.1.2.3 Bus2=300.1.2.3 LineCode=3 Length=1 units=kft
New Line.L109 Phases=1 Bus1=109.1 Bus2=110.1 LineCode=9 Length=0.3 units=kft
New Line.L110 Phases=1 Bus1=110.1 Bus2=111.1 LineCode=9 Length=0.575 units=kft
New Line.L111 Phases=1 Bus1=110.1 Bus2=112.1 LineCode=9 Length=0.125 units=kft
New Line.L112 Phases=1 Bus1=112.1 Bus2=113.1 LineCode=9 Length=0.525 units=kft
New Line.L113 Phases=1 Bus1=113.1 Bus2=114.1 LineCode=9 Length=0.325 units=kft
New Line.L114 Phases=3 Bus1=135.1.2.3 Bus2=35.1.2.3 LineCode=4 Length=0.375 units=kft
New Line.L116 Phases=3 Bus1=152.1.2.3 Bus2=52.1.2.3 LineCode=1 Length=0.4 units=kft
New Line.L117 Phases=3 Bus1=160r.1.2.3 Bus2=67.1.2.3 LineCode=6 Length=0.35 units=kft
! NORMALLY CLOSED SWITCHES ARE DEFINED AS SHORT LINES
! Could also be defned by setting the Switch=Yes property
New Line.Sw1 phases=3 Bus1=150r Bus2=149 r1=1e-3 r0=1e-3 x1=0.000 x0=0.000 c1=0.000 c0=0.000 Length=0.001
New Line.Sw2 phases=3 Bus1=13 Bus2=152 r1=1e-3 r0=1e-3 x1=0.000 x0=0.000 c1=0.000 c0=0.000 Length=0.001
New Line.Sw3 phases=3 Bus1=18 Bus2=135 r1=1e-3 r0=1e-3 x1=0.000 x0=0.000 c1=0.000 c0=0.000 Length=0.001
New Line.Sw4 phases=3 Bus1=60 Bus2=160 r1=1e-3 r0=1e-3 x1=0.000 x0=0.000 c1=0.000 c0=0.000 Length=0.001
New Line.Sw5 phases=3 Bus1=97 Bus2=197 r1=1e-3 r0=1e-3 x1=0.000 x0=0.000 c1=0.000 c0=0.000 Length=0.001
New Line.Sw6 phases=3 Bus1=61 Bus2=61s r1=1e-3 r0=1e-3 x1=0.000 x0=0.000 c1=0.000 c0=0.000 Length=0.001
! NORMALLY OPEN SWITCHES; DEFINED AS SHORT LINE TO OPEN BUS SO WE CAN SEE OPEN POINT VOLTAGES.
! COULD ALSO BE DEFINED AS DISABLED OR THE TERMINCAL COULD BE OPENED AFTER BEING DEFINED
New Line.Sw7 phases=3 Bus1=151 Bus2=300_OPEN r1=1e-3 r0=1e-3 x1=0.000 x0=0.000 c1=0.000 c0=0.000 Length=0.001
New Line.Sw8 phases=1 Bus1=54.1 Bus2=94_OPEN.1 r1=1e-3 r0=1e-3 x1=0.000 x0=0.000 c1=0.000 c0=0.000 Length=0.001
! LOAD TRANSFORMER AT 61s/610
! This is a 150 kVA Delta-Delta stepdown from 4160V to 480V.
New Transformer.XFM1 Phases=3 Windings=2 Xhl=2.72
~ wdg=1 bus=61s conn=Delta kv=4.16 kva=150 %r=0.635
~ wdg=2 bus=610 conn=Delta kv=0.48 kva=150 %r=0.635
! CAPACITORS
! Capacitors are 2-terminal devices. The 2nd terminal (Bus2=...) defaults to all phases
! connected to ground (Node 0). Thus, it need not be specified if a Y-connected or L-N connected
! capacitor is desired
New Capacitor.C83 Bus1=83 Phases=3 kVAR=600 kV=4.16
New Capacitor.C88a Bus1=88.1 Phases=1 kVAR=50 kV=2.402
New Capacitor.C90b Bus1=90.2 Phases=1 kVAR=50 kV=2.402
New Capacitor.C92c Bus1=92.3 Phases=1 kVAR=50 kV=2.402
!REGULATORS - REDIRECT TO DEFINITIONS FILE
! This file contains definitions for the remainder of regulators on the feeder:
Redirect IEEE123Regulators.DSS
! SPOT LOADS -- REDIRECT INPUT STREAM TO LOAD DEFINITIONS FILE
Redirect IEEE123Loads.DSS
! All devices in the test feeder are now defined.
!
! Many of the voltages are reported in per unit, so it is important to establish the base voltages at each bus so
! that we can compare with the result with greater ease.
! We will let the DSS compute the voltage bases by doing a zero-load power flow.
! There are only two voltage bases in the problem: 4160V and 480V. These must be expressed in kV
Set VoltageBases = [4.16, 0.48] ! ARRAY OF VOLTAGES IN KV
CalcVoltageBases ! PERFORMS ZERO LOAD POWER FLOW TO ESTIMATE VOLTAGE BASES