We provide all the information about MCP servers via our MCP API.
curl -X GET 'https://glama.ai/api/mcp/v1/servers/NeoTecDigital/mcp_shamash'
If you have feedback or need assistance with the MCP directory API, please join our Discord server
# Coordinator Decision Log - MCP Shamash
## 2025-09-02 - Sprint 5 Coordination
- **Time**: 10:00
- **Decision**: Begin Sprint 5 Advanced Features
- **State**: Sprints 1-4 complete, ready for advanced features
- **Assessment**:
- ✅ Caching exists: needs enhancement for incremental
- ✅ Parallel execution: operational, needs optimization
- ✅ Basic remediation: exists in compliance, needs advisor module
- ❌ Incremental scanning: not implemented
- ❌ False positive filter: not implemented
- **Action**: Focus on NEW features + ENHANCE existing ones
- **Parallel Tracks**:
- Track A: Incremental scanning + cache enhancement
- Track B: Remediation advisor + FP filtering
- Track C: Performance optimization
## 2025-09-02 - Pre-Development Validation Phase
- **Time**: Current session
- **Decision**: Comprehensive review before development
- **Rationale**: Project has ~95% spec completion with new pentesting features
- **Actions**:
1. Reviewing all documentation for consistency
2. Validating network boundary enforcement design
3. Confirming sandbox isolation architecture
4. Preparing quality review cycle
5. Planning test strategy development
6. Scheduling Sprint 1 task breakdown
## 2025-09-02 - Session Initialization
- **Assessment**: New project with minimal structure (~20% specs)
- **Decision**: Full research and planning workflow required
- **Rationale**:
- Only basic CLAUDE.md exists
- No roadmap, AGILE structure, or detailed specs
- Critical security constraints require thorough research
- Need comprehensive compliance framework analysis
- **Workflow**: Initialize → Analyze → Research → Plan → Design
- **Priority Constraints**:
1. Project-scoped security only
2. Token efficiency
3. Containerization support
4. Industry compliance standards
## 2025-09-02 - Research & Planning Complete
- **Assessment**: All research and planning phases successfully completed
- **Decision**: Ready to transition to Sprint 1 development
- **Key Findings**:
- Recommended tools: Semgrep, Trivy, Gitleaks, Checkov
- Architecture: TypeScript, Node.js 20, containerized
- Compliance: Multi-framework support validated
- All constraints validated and achievable
- **Next Phase**: Sprint 1 - Foundation (2 weeks)
- **Success Metrics**: 85% specs complete, full documentation