Surface graph hygiene gaps
surface_gapsIdentify planning gaps in a project's dependency graph: cycles, isolated tickets, and keystone tickets without estimates or owners.
Instructions
Report deterministic planning gaps in a project's dependency graph: cycles, isolated tickets, and high-leverage (keystone) tickets missing an estimate or owner. Analysis only — asserts nothing, writes nothing. project_id accepts a name, slug, or UUID.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| project_id | Yes | Linear project name, URL slug, or UUID |