Compute NEC 690.8 PV circuit current
solar-design_nec-690-currentCompute PV circuit maximum current and minimum conductor ampacity using NEC 690.8 125% factors for the selected code edition. Price $0.02 USDC. POST /api/v1/solar-design/nec-690-current. An unpaid call returns the x402 payment terms and does not run.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"moduleIsc": "<moduleIsc>"
},
"name": "solar-design_nec-690-current"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| edition | No | edition, string, one of 2017, 2020, 2023. Required. | 2023 |
| moduleIsc | Yes | moduleIsc, number. Required. | |
| parallelStrings | No | parallelStrings, integer, from any to 9007199254740991. Required. | |
| continuousFactor | No | continuousFactor, number. Required. |
Output Schema
| Name | Required | Description | Default |
|---|---|---|---|
| edition | No | edition. String. | |
| sources | No | sources. Array. | |
| limitations | No | limitations. Array. | |
| minOcpdRating | No | minOcpdRating. Number. | |
| maxCircuitCurrent | No | maxCircuitCurrent. Number. | |
| perStringMaxCurrent | No | perStringMaxCurrent. Number. | |
| minConductorAmpacity | No | minConductorAmpacity. Number. |