BRAINIAC Electrical Engineering & Installation Intelligence
Server Details
Paid Electrical Engineering & Installation Intelligence API via x402. Unpaid tool calls return 402.
- Status
- Healthy
- Uptime
- 100.0% over the last 24 hours
- Last Tested
- Transport
- Streamable HTTP · MCP 2025-11-25
- URL
- ChatGPT
- –
- Claude
- –
TDQS
Score is being calculated.
Available Tools
10 toolselectrical-engineering_breaker-rating-checkCheck breaker ratingsBInspect
Compare calculated design current to caller-supplied breaker ratings and continuous factors. Code rules are not invented. Price $0.03 USDC. POST /api/v1/electrical-engineering/breaker-rating-check. Unpaid calls return 402 and do not run.
Inputs: csv, asOf, file, json, +10 more.
electrical-engineering_cable-sizing-calculateCheck cable sizingCInspect
Compare calculated design current to caller-supplied cable ampacity. Ampacity tables are not invented. Price $0.04 USDC. POST /api/v1/electrical-engineering/cable-sizing-calculate. Unpaid calls return 402 and do not run.
Inputs: csv, asOf, file, json, +10 more.
electrical-engineering_design-document-auditAudit electrical design documentsBInspect
Audit completeness of supplied electrical design inputs and aggregate load, balance, drop, cable, breaker, transformer, PF, generator, and EV checks. Does not invent code compliance. Price $0.08 USDC. POST /api/v1/electrical-engineering/design-document-audit. Unpaid calls return 402 and do not run.
Inputs: csv, asOf, file, json, +10 more.
electrical-engineering_ev-charger-load-capacity-checkCheck EV charger load capacityBInspect
Check EV charger design current against caller-supplied panel capacity and existing load. Continuous factors are used only when supplied. Price $0.04 USDC. POST /api/v1/electrical-engineering/ev-charger-load-capacity-check. Unpaid calls return 402 and do not run.
Inputs: csv, asOf, file, json, +10 more.
electrical-engineering_generator-sizing-calculateCalculate generator sizingAInspect
Size required generator kVA from supplied load and caller diversity, reserve, and derate factors. Price $0.04 USDC. POST /api/v1/electrical-engineering/generator-sizing-calculate. Unpaid calls return 402 and do not run.
Inputs: csv, asOf, file, json, +10 more.
electrical-engineering_load-schedule-calculateCalculate electrical load schedulesCInspect
Calculate kW, kVA, and current for caller-supplied loads using supplied voltage and power factor. Missing values are not invented. Price $0.04 USDC. POST /api/v1/electrical-engineering/load-schedule-calculate. Unpaid calls return 402 and do not run.
Inputs: csv, asOf, file, json, +10 more.
electrical-engineering_power-factor-correction-calculateCalculate power factor correctionBInspect
Calculate required kVAR (and optional capacitance) to move from a supplied power factor to a supplied target. Price $0.03 USDC. POST /api/v1/electrical-engineering/power-factor-correction-calculate. Unpaid calls return 402 and do not run.
Inputs: csv, asOf, file, json, +10 more.
electrical-engineering_three-phase-load-balance-checkCheck three-phase load balanceCInspect
Compare phase-leg currents from supplied loads and report imbalance percentage. Optional caller rule thresholds are compared when provided. Price $0.03 USDC. POST /api/v1/electrical-engineering/three-phase-load-balance-check. Unpaid calls return 402 and do not run.
Inputs: csv, asOf, file, json, +10 more.
electrical-engineering_transformer-capacity-calculateCalculate transformer capacityBInspect
Compare transformer rated kVA to supplied or schedule load kVA and report loading percentage. Price $0.04 USDC. POST /api/v1/electrical-engineering/transformer-capacity-calculate. Unpaid calls return 402 and do not run.
Inputs: csv, asOf, file, json, +10 more.
electrical-engineering_voltage-drop-calculateCalculate voltage dropBInspect
Calculate voltage drop from supplied cable resistance/reactance, length, and load current. Cable tables are not invented. Price $0.04 USDC. POST /api/v1/electrical-engineering/voltage-drop-calculate. Unpaid calls return 402 and do not run.
Inputs: csv, asOf, file, json, +10 more.
Tool Schema Changelog
Recent tool additions, removals, and schema changes observed during successful MCP inspections.
Loading tool schema changelog…
Related MCP Connectors
Paid Building Energy & Facilities Intelligence API via x402. Unpaid tool calls return 402.
1Paid Electricity Market & Grid Intelligence API via x402. Unpaid tool calls return 402.
1Paid Energy Intelligence API via x402. Unpaid tool calls return 402.
1Paid Construction Site Operations API via x402. Unpaid tool calls return 402.
1
Related MCP Servers
- AlicenseNot gradedqualityDmaintenanceEnables MCP-capable agents to call 40 paid API tools—including OCR, PDF, image, tabular, and web utilities—by paying per request via x402 micropayments on Base, with no API key, subscription, or signup required.MIT
- AlicenseNot gradedqualityCmaintenanceEnables AI agents and bots to buy per-call data and intelligence — token safety verdicts, prices, news, weather, web-to-text, and research dossiers — without signup or API keys, since each call is authenticated by an on-chain USDC payment on Base via the x402 protocol. Clients hit any paid endpoint, receive an HTTP 402 challenge, sign an EIP-3009 transfer authorization, and retry to get the data.1MIT
- AlicenseAqualityCmaintenanceLive and historical electricity prices, demand, generation mix and carbon intensity for 25 grid zones (US, Europe, GB, Australia). Hosted endpoint plus local stdio bridge; free sample mode, free API key, or x402 pay-per-call.6MIT
- AlicenseBqualityBmaintenanceEnables users to access a free catalog and samples plus 17 pay-per-call tools, settled in USDC on Base via x402, for web reading, source-bounded summarization, Rioplatense Spanish translation, market and Argentine data, developer utilities, text comparison, and x402-related queries.1959 npmMIT
Glama MCP Gateway
Add one secure layer between your agents and this server.