Zovo Project Timeline
Server Details
A Gantt chart maker and project timeline planner that works inside the chat.
- Status
- Healthy
- Uptime
- 100.0% over the last 24 hours
- Last Tested
- Transport
- Streamable HTTP · MCP 2025-11-25
- URL
- ChatGPT
- –
- Claude
- Ganttly Project Timeline
TDQS
Scored across 2 tools
The two tools have clearly distinct purposes: one builds a baseline schedule, the other compares what-if scenarios against that schedule. Descriptions even include explicit 'do not use for X, use Y instead' cross-references, so an agent cannot easily misselect.
Both follow a clean snake_case verb_noun pattern (plan_project_timeline, compare_timeline_scenarios) with the domain noun consistently present. No mixed conventions.
Two tools is on the thin side for a project-scheduling server, even though both are substantial. A small number of additional operations (e.g. adjusting a saved plan) would round out the surface without bloat.
Core CPM computation, scenario comparison, and export formats are well covered, but the surface explicitly lacks persistence, incremental plan updates, progress tracking, and resource leveling. An agent asked to modify or track an existing schedule will hit a dead end.
Available Tools
2 toolscompare_timeline_scenariosCompare timeline what-ifsARead-onlyIdempotentInspect
Use this when the user asks what happens to a project schedule if a task slips, takes longer or shorter, or starts later: for example "if Design slips 5 days, when do we finish?" or "does the critical path change?". Takes the same task list and calendar as plan_project_timeline plus 1 to 4 scenarios, each with changes (extra_days, a new duration, or a new start-no-earlier-than date). Returns the baseline and each scenario's end date, the delay in working and calendar days, the new critical path, tasks that became or stopped being critical, and how much of each slip was absorbed by float. Does not change or save the plan. Do not use for the first schedule of a project (use plan_project_timeline).
Inputs: tasks (required), scenarios (required), country, calendar, +5 more. Returns: baseline, warnings, scenarios, project_name, +1 more
plan_project_timelinePlan project timelineARead-onlyIdempotentInspect
Use this when the user wants a Gantt chart, project timeline, project schedule or project plan with milestones from a task list, wants to find the critical path and project duration, or asks for early start, early finish, late start, late finish, total float or free float (critical path method). Takes tasks with durations (days or weeks), finish-to-start dependencies with optional lags, optional start-no-earlier-than dates, owners and milestones, plus a start date and a business-day calendar with country public holidays or calendar days. Returns every task's dates and float, the critical path, milestones and the end date, an interactive Gantt chart, and CSV, .ics and SVG downloads. Detects dependency loops and unknown task names. Does not save projects, sync with project tools, track progress, or level resources. Do not use for a single date difference or for daily to-do planning.
Inputs: tasks (required), country, calendar, start_date, +4 more. Returns: tasks, request, calendar, end_date, +8 more
Tool Schema Changelog
Recent tool additions, removals, and schema changes observed during successful MCP inspections.
Loading tool schema changelog…
Related MCP Connectors
Build Gantt charts from your AI chat: tasks, dependencies, timeline spreadsheets. All data is local.
Create scheduled Gantt charts with critical path from a plain-language plan — no account or key.
Plan work sessions and run pomodoro timers right in the conversation.
Gantt chart SaaS with server-side critical path and dependency-aware shift-impact tools, plus CRUD.
Related MCP Servers
- AlicenseAqualityBmaintenanceEnables creating scheduled Gantt charts with critical-path analysis from any MCP client using plain-language task descriptions, with no account or API key required.461 npmMIT
- AlicenseNot gradedqualityDmaintenanceEnables collaborative project planning by connecting an MCP-capable chat app to a generative AI that manages tasks and dependencies, with a live web UI for visualization.1GPL 3.0
- AlicenseNot gradedqualityCmaintenanceEnables AI agents to track time, manage the project board with epics, milestones, schedules and dependencies, and generate shareable reports through a single authenticated connection.MIT
- AlicenseCqualityCmaintenanceEnables AI agents to create and manage small project plans—including tasks, assignees, status, progress, dates, and dependencies—and retrieve Gantt-friendly project views over MCP stdio. State is stored in SQLite without external dependencies.10MIT
Glama MCP Gateway
Add one secure layer between your agents and this server.