Skip to main content
Glama

Server Details

Change orders against quotes and work orders: line changes, approval, running contract value.

If you are the author of this connector, you can claim ownership. Claimed connector authors can inspect health checks, view analytics, and manage their listing.
Status
Healthy
Uptime
100.0% over the last 24 hours
Last Tested
Transport
Streamable HTTP · MCP 2025-11-25
URL
Repository
theluckystrike/mcp-servers
GitHub Stars
0
ChatGPT
–
Claude
–

TDQS

A3.8/5.0

Scored across 11 tools

Disambiguation4/5

The change_order_* tools each target a distinct action (create, add_line, get, list, status, delete, document, invoice_payload) and are easy to tell apart. The only mild overlap is between change_order_list's delta summaries and contract_value, plus change_order_get vs change_order_list, but descriptions clarify the difference.

Naming Consistency4/5

Eight tools share a clean change_order_<verb> snake_case pattern; contract_value and license_activate/license_status deviate from the prefix but stay consistent snake_case and reflect genuinely separate concerns. Minor deviation, not confusion.

Tool Count5/5

11 tools is well within a reasonable range and each earns its place: CRUD, lifecycle transition, document rendering, invoice payload, and licensing.

Completeness4/5

The lifecycle is well covered (create, add lines, list/get, status transitions, document, invoice payload, contract value, delete-with-guards). The notable gap is line editing/removal — lines can be added but not corrected or removed on a draft.

Available Tools

11 tools
change_order_add_lineAdd a changed lineAInspect

Add one line to a draft change order: added or removed with a quantity and a unit price in minor units, or changed with the old and the new quantity and price, each with a reason and a date. Free.

Inputs: kind (required), reason (required), quantity (required), description (required), +7 more.

change_order_createRaise a change orderAInspect

Raise a change order against a quote or work order and return its CO-YYYY-NNNN number: the reference, the client, a title, the date, and the original contract value in minor units. Free tier: 5 open.

Inputs: title (required), client (required), reference (required), date, +5 more.

change_order_deleteDelete an empty draftA
Destructive
Inspect

Delete a DRAFT change order with no lines, freeing an open slot. One sent, approved, rejected or voided is refused, and so is one carrying lines: void it with change_order_status instead. The number is not reissued.

Inputs: change_order (required).

change_order_documentChange order documentAInspect

Render one change order as a plain-text document for the client to approve: every line with its reason, the delta net and gross, the contract value before and after, and an approval block. The same text also comes back as a .txt download link valid for one hour. Pro.

Inputs: change_order (required).

change_order_getShow one change orderBInspect

Return one change order in full by CO number or client: every added, removed and changed line with its reason and delta, VAT, delta gross, the status history and the running value. change_order_list finds the id.

Inputs: change_order (required).

change_order_invoice_payloadInvoice payload for an approved deltaBInspect

Build the approved delta as invoice_create-ready items in MAJOR units and quote_create-ready items in MINOR units, with VAT at the shared profile rate. Writes nothing and creates nothing. Pro.

Inputs: change_order (required), tax_rate, issue_date.

change_order_listList change ordersAInspect

List change orders newest first with status, reference, client, currency and net delta, and above them the APPROVED and the pending delta per currency, kept apart. Filter by reference, status, client, date.

Inputs: to, from, limit, client, +2 more.

change_order_statusMove a change order alongAInspect

Move one change order along and stamp the date and note: draft to sent, sent to approved or rejected, either to void. Backwards steps, an unsent approval and a backdated move are all refused.

Inputs: status (required), change_order (required), date, note.

contract_valueRunning contract valueAInspect

The running value of one quote or work order: original, approved deltas and current value, with pending draft and sent deltas kept apart. Net of VAT. A reference with no change order is refused.

Inputs: reference (required).

license_activateActivate licenseAInspect

Turn Pro on for this connection with key, an MCPL1.. issued at checkout for this server or the bundle. Data under your token stays; a wrong or expired key changes nothing. license_status confirms it.

Inputs: key (required).

license_statusLicense statusA
Read-onlyIdempotent
Inspect

Report this endpoint's licence state for your token as JSON: the product, the tier free or pro, why it is not Pro, and the checkout URL. Call it to explain a free-tier refusal. No arguments, nothing changes.

Inputs: no named parameters.

Tool Schema Changelog

Recent tool additions, removals, and schema changes observed during successful MCP inspections.

Loading tool schema changelog…

    Related MCP Connectors

    Related MCP Servers

    • A
      license
      A
      quality
      B
      maintenance
      Enables trades and field service work to be tracked per job: logging labor hours at worker rates and materials used, keeping running totals in integer cents per currency, and moving each job through a status machine from open to invoiced or archived. It also produces daily or weekly summaries of hours and value, and renders a printable card with a signature line for client sign-off.
      11
      MIT
    • A
      license
      A
      quality
      B
      maintenance
      Enables users to create reusable purchase requisition checklists, run them against individual orders, record step-by-step pass/fail/NA results with attributions, and sign off to freeze a dated, auditable approval record.
      16
      MIT
    • A
      license
      Not graded
      quality
      B
      maintenance
      Connects AI assistants such as Claude, ChatGPT, Microsoft 365 Copilot, Cursor and Codex to a field service management workspace so they can read and change data on customers, jobs, technicians, invoices, dispatch, comms and reports. It also lets users build and modify the software itself — new fields, screens, tables, automations and agents — with changes staged as drafts in a sandbox workspace and going live only after administrator approval and rollback protection.
      MIT
    Try in Browser

    Glama MCP Gateway

    Add one secure layer between your agents and this server.