Skip to main content
Glama

The Cable Code

IEC 60287 rating of one MV or HV circuit

iec60287_rating
Read-only

IEC 60287 rating of one MV or HV circuit at the site sent (buried, ducts or air), each step with clause and page; optional IEC 60853 cyclic and emergency ratings, banks, troughs, crossings. $5.00 USDC per calculation (x402), no free allowance. Notes: thecablecode://guide/iec60287_rating.

Tool call template

This tool declares no required parameters. Add optional parameters from the input schema as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {},
    "name": "iec60287_rating"
  }
}

Input Schema

NameRequiredDescriptionDefault
langNoAnswer language; default en.
specNoOr a design_cable spec.
inputNoinput: {laying: buried | duct | air, formation: trefoil | flat, bonding, depthM?, soil?, groundC?, airC?, cycle?, emergency?, ...}
itemsNoOr a list of {sentence | spec | design, input}, paid per item.
designNoOr a design_cable design.
sentenceNoThe cable, as design_cable takes it.

Schema Changelog

Changes observed during successful MCP inspections.

  1. Changed6 schema fields changed
    • changedInput schema / properties / design / description
      Previous value: -"Instead of a sentence: the design field of a design_cable answer."New value: +"Or a design_cable design."
    • changedInput schema / properties / input / description
      Previous value: -"input: {laying: buried | duct | air, formation: trefoil | flat, bonding: both | single | cross, freq?: 50 | 60, spacingMm? (axis to axis; absent: touching), depthM? (default 1), soil? (K·m/W, default 1), groundC? (default 20), airC? (default 25), duct?: {material: pe | pvc | earthenware, innerMm, outerMm} (laying duct), solar? (W/m², laying air; absent: shaded), spacing25?: true (bonding both, the spacing along the route not known: the screen loss raised by 25 %, IEC 60287-1-1 2.3.4 b)), transposed?: true (flat, bonding both: 2.3.2), minor?: {p, q} (cross-bonded: the longer minor sections over the shortest, 2.3.6.2), milliken?: insulated | oneWay | twoWay (a Milliken copper conductor's wires, Table 2), armourLayMm? (a single core's steel wires over lead, 2.4.2.1), drying?: {rhoDry, thetaX} (buried, touching: 1.4.2.1; with cycle IEC 60853-3), cycle?: [24 hourly currents] (IEC 60853), diffusivity? (m²/s; absent: IEC 60853-1 Table II), emergency?: {preA, hours, thetaMaxC?} (IEC 60853-2 clause 8; absent limit: the normal maximum), bank?: {xMm, yMm, rho?} (laying duct: the ducts in a concrete bank, its sides, mm, depthM to its centre; rho default 1.0, IEC 60287-2-1 Table 1), trough?: \"sand\" (laying buried: the sand at 2.5 K·m/W, 4.2.6.1) | {perimeterM} (laying air: an unfilled trough flush with the ground, 4.2.6.2), circuits?: {count, spacingMm} (buried or duct: identical circuits side by side, centres apart, 4.2.3.3.1), crossing?: {wattsPerM, depthM, angleDeg?} (buried or duct: a crossing heat source, IEC 60287-3-3; angle default 90)}; a three-core design needs neither formation nor bonding"New value: +"input: {laying: buried | duct | air, formation: trefoil | flat, bonding, depthM?, soil?, groundC?, airC?, cycle?, emergency?, ...}"
    • changedInput schema / properties / items / description
      Previous value: -"Instead of one: a project's list, 1 to 50 items, each {sentence | spec | design, input}; always in full, paid per item."New value: +"Or a list of {sentence | spec | design, input}, paid per item."
    • changedInput schema / properties / lang / description
      Previous value: -"Any of the site's 15 languages; default en."New value: +"Answer language; default en."
    • changedInput schema / properties / sentence / description
      Previous value: -"The cable in words or its designation, as design_cable takes it."New value: +"The cable, as design_cable takes it."
    • changedInput schema / properties / spec / description
      Previous value: -"Instead of a sentence: a spec as design_cable takes it."New value: +"Or a design_cable spec."
  2. Changed1 schema field changed
    • changedInput schema / properties / input / description
      Previous value: -"input: {laying: buried | duct | air, formation: trefoil | flat, bonding: both | single | cross, freq?: 50 | 60, spacingMm? (axis to axis; absent: touching), depthM? (default 1), soil? (K·m/W, default 1), groundC? (default 20), airC? (default 25), duct?: {material: pe | pvc | earthenware, innerMm, outerMm} (laying duct), solar? (W/m², laying air; absent: shaded), spacing25?: true (bonding both, the spacing along the route not known: the screen loss raised by 25 %, IEC 60287-1-1 2.3.4 b)), transposed?: true (flat, bonding both: 2.3.2), minor?: {p, q} (cross-bonded: the longer minor sections over the shortest, 2.3.6.2), milliken?: insulated | oneWay | twoWay (a Milliken copper conductor's wires, Table 2), armourLayMm? (a single core's steel wires over lead, 2.4.2.1), drying?: {rhoDry, thetaX} (buried, touching: 1.4.2.1), cycle?: [24 hourly currents] (IEC 60853), diffusivity? (m²/s; absent: IEC 60853-1 Table II), emergency?: {preA, hours, thetaMaxC?} (IEC 60853-2 clause 8; absent limit: the normal maximum), bank?: {xMm, yMm, rho?} (laying duct: the ducts in a concrete bank, its sides, mm, depthM to its centre; rho default 1.0, IEC 60287-2-1 Table 1), trough?: \"sand\" (laying buried: the sand at 2.5 K·m/W, 4.2.6.1) | {perimeterM} (laying air: an unfilled trough flush with the ground, 4.2.6.2), circuits?: {count, spacingMm} (buried or duct: identical circuits side by side, centres apart, 4.2.3.3.1), crossing?: {wattsPerM, depthM, angleDeg?} (buried or duct: a crossing heat source, IEC 60287-3-3; angle default 90)}; a three-core design needs neither formation nor bonding"New value: +"input: {laying: buried | duct | air, formation: trefoil | flat, bonding: both | single | cross, freq?: 50 | 60, spacingMm? (axis to axis; absent: touching), depthM? (default 1), soil? (K·m/W, default 1), groundC? (default 20), airC? (default 25), duct?: {material: pe | pvc | earthenware, innerMm, outerMm} (laying duct), solar? (W/m², laying air; absent: shaded), spacing25?: true (bonding both, the spacing along the route not known: the screen loss raised by 25 %, IEC 60287-1-1 2.3.4 b)), transposed?: true (flat, bonding both: 2.3.2), minor?: {p, q} (cross-bonded: the longer minor sections over the shortest, 2.3.6.2), milliken?: insulated | oneWay | twoWay (a Milliken copper conductor's wires, Table 2), armourLayMm? (a single core's steel wires over lead, 2.4.2.1), drying?: {rhoDry, thetaX} (buried, touching: 1.4.2.1; with cycle IEC 60853-3), cycle?: [24 hourly currents] (IEC 60853), diffusivity? (m²/s; absent: IEC 60853-1 Table II), emergency?: {preA, hours, thetaMaxC?} (IEC 60853-2 clause 8; absent limit: the normal maximum), bank?: {xMm, yMm, rho?} (laying duct: the ducts in a concrete bank, its sides, mm, depthM to its centre; rho default 1.0, IEC 60287-2-1 Table 1), trough?: \"sand\" (laying buried: the sand at 2.5 K·m/W, 4.2.6.1) | {perimeterM} (laying air: an unfilled trough flush with the ground, 4.2.6.2), circuits?: {count, spacingMm} (buried or duct: identical circuits side by side, centres apart, 4.2.3.3.1), crossing?: {wattsPerM, depthM, angleDeg?} (buried or duct: a crossing heat source, IEC 60287-3-3; angle default 90)}; a three-core design needs neither formation nor bonding"
  3. Changed1 schema field changed
    • changedInput schema / properties / input / description
      Previous value: -"input: {laying: buried | duct | air, formation: trefoil | flat, bonding: both | single | cross, freq?: 50 | 60, spacingMm? (axis to axis; absent: touching), depthM? (default 1), soil? (K·m/W, default 1), groundC? (default 20), airC? (default 25), duct?: {material: pe | pvc | earthenware, innerMm, outerMm} (laying duct), solar? (W/m², laying air; absent: shaded), spacing25?: true (bonding both, the spacing along the route not known: the screen loss raised by 25 %, IEC 60287-1-1 2.3.4 b)), transposed?: true (flat, bonding both: 2.3.2), minor?: {p, q} (cross-bonded: the longer minor sections over the shortest, 2.3.6.2), milliken?: insulated | oneWay | twoWay (a Milliken copper conductor's wires, Table 2), armourLayMm? (a single core's steel wires over lead, 2.4.2.1), drying?: {rhoDry, thetaX} (buried, touching: 1.4.2.1), cycle?: [24 hourly currents] (IEC 60853), diffusivity? (m²/s; absent: IEC 60853-1 Table II), emergency?: {preA, hours, thetaMaxC?} (IEC 60853-2 clause 8; absent limit: the normal maximum)}; a three-core design needs neither formation nor bonding"New value: +"input: {laying: buried | duct | air, formation: trefoil | flat, bonding: both | single | cross, freq?: 50 | 60, spacingMm? (axis to axis; absent: touching), depthM? (default 1), soil? (K·m/W, default 1), groundC? (default 20), airC? (default 25), duct?: {material: pe | pvc | earthenware, innerMm, outerMm} (laying duct), solar? (W/m², laying air; absent: shaded), spacing25?: true (bonding both, the spacing along the route not known: the screen loss raised by 25 %, IEC 60287-1-1 2.3.4 b)), transposed?: true (flat, bonding both: 2.3.2), minor?: {p, q} (cross-bonded: the longer minor sections over the shortest, 2.3.6.2), milliken?: insulated | oneWay | twoWay (a Milliken copper conductor's wires, Table 2), armourLayMm? (a single core's steel wires over lead, 2.4.2.1), drying?: {rhoDry, thetaX} (buried, touching: 1.4.2.1), cycle?: [24 hourly currents] (IEC 60853), diffusivity? (m²/s; absent: IEC 60853-1 Table II), emergency?: {preA, hours, thetaMaxC?} (IEC 60853-2 clause 8; absent limit: the normal maximum), bank?: {xMm, yMm, rho?} (laying duct: the ducts in a concrete bank, its sides, mm, depthM to its centre; rho default 1.0, IEC 60287-2-1 Table 1), trough?: \"sand\" (laying buried: the sand at 2.5 K·m/W, 4.2.6.1) | {perimeterM} (laying air: an unfilled trough flush with the ground, 4.2.6.2), circuits?: {count, spacingMm} (buried or duct: identical circuits side by side, centres apart, 4.2.3.3.1), crossing?: {wattsPerM, depthM, angleDeg?} (buried or duct: a crossing heat source, IEC 60287-3-3; angle default 90)}; a three-core design needs neither formation nor bonding"
  4. Changed1 schema field changed
    • changedInput schema / properties / input / description
      Previous value: -"input: {laying: buried | duct | air, formation: trefoil | flat, bonding: both | single | cross, freq?: 50 | 60, spacingMm? (axis to axis; absent: touching), depthM? (default 1), soil? (K·m/W, default 1), groundC? (default 20), airC? (default 25), duct?: {material: pe | pvc | earthenware, innerMm, outerMm} (laying duct), solar? (W/m², laying air; absent: shaded), spacing25?: true (bonding both, the spacing along the route not known: the screen loss raised by 25 %, IEC 60287-1-1 2.3.4 b))}"New value: +"input: {laying: buried | duct | air, formation: trefoil | flat, bonding: both | single | cross, freq?: 50 | 60, spacingMm? (axis to axis; absent: touching), depthM? (default 1), soil? (K·m/W, default 1), groundC? (default 20), airC? (default 25), duct?: {material: pe | pvc | earthenware, innerMm, outerMm} (laying duct), solar? (W/m², laying air; absent: shaded), spacing25?: true (bonding both, the spacing along the route not known: the screen loss raised by 25 %, IEC 60287-1-1 2.3.4 b)), transposed?: true (flat, bonding both: 2.3.2), minor?: {p, q} (cross-bonded: the longer minor sections over the shortest, 2.3.6.2), milliken?: insulated | oneWay | twoWay (a Milliken copper conductor's wires, Table 2), armourLayMm? (a single core's steel wires over lead, 2.4.2.1), drying?: {rhoDry, thetaX} (buried, touching: 1.4.2.1), cycle?: [24 hourly currents] (IEC 60853), diffusivity? (m²/s; absent: IEC 60853-1 Table II), emergency?: {preA, hours, thetaMaxC?} (IEC 60853-2 clause 8; absent limit: the normal maximum)}; a three-core design needs neither formation nor bonding"
  5. Changed1 schema field changed
    • changedInput schema / properties / input / description
      Previous value: -"input: {laying: buried | duct | air, formation: trefoil | flat, bonding: both | single | cross, freq?: 50 | 60, spacingMm? (axis to axis; absent: touching), depthM? (default 1), soil? (K·m/W, default 1), groundC? (default 20), airC? (default 25), duct?: {material: pe | pvc | earthenware, innerMm, outerMm} (laying duct), solar? (W/m², laying air; absent: shaded)}"New value: +"input: {laying: buried | duct | air, formation: trefoil | flat, bonding: both | single | cross, freq?: 50 | 60, spacingMm? (axis to axis; absent: touching), depthM? (default 1), soil? (K·m/W, default 1), groundC? (default 20), airC? (default 25), duct?: {material: pe | pvc | earthenware, innerMm, outerMm} (laying duct), solar? (W/m², laying air; absent: shaded), spacing25?: true (bonding both, the spacing along the route not known: the screen loss raised by 25 %, IEC 60287-1-1 2.3.4 b))}"
  6. Added

TDQS

A3.7/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Beyond the readOnlyHint/openWorldHint annotations, the description discloses non-obvious behavior: each step is reported with its clause and page reference, and pricing is $5.00 USDC per calculation via x402 with no free allowance. The cost and auditability disclosures are genuinely useful for an agent deciding whether to invoke. It still says nothing about failure modes or runtime.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness5/5

Is the description appropriately sized, front-loaded, and free of redundancy?

One dense but well-ordered sentence covering scope, regimes, output traceability and optional extensions, followed by the price and a documentation pointer. No filler sentences and the key scoping constraint is front-loaded.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness3/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

For a tool with six optional parameters, nested objects and no required fields, the description leaves the most consequential ambiguity unresolved: which of sentence/spec/design/input/items the caller should supply. The output hint ('each step with clause and page') partially compensates for the absent output schema, so it is adequate but not complete.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100%, so the schema already documents lang, spec, input, items, design and sentence. The description adds little semantic detail beyond echoing the laying modes and cyclic/emergency flags already present in the input schema, and it never explains how the alternative top-level inputs (sentence vs spec vs design vs items) relate.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

States a specific computation (IEC 60287 rating) for a specific resource scope ('one MV or HV circuit'), and names the installation regimes (buried, ducts, air) plus optional IEC 60853 cyclic/emergency extensions. It is clearly a rating calculator rather than a design or equivalence tool, though it does not name any sibling to contrast against.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines3/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Usage is implied by 'one MV or HV circuit at the site sent', and optional features are listed, so an agent can infer this is for a single-circuit ampacity check. However, there is no explicit when-to-use versus when-not guidance (e.g. when to prefer design_cable or mv_electrical), and the mutual exclusivity of the six input paths is never stated.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.

Resources