XLPE degassing time estimate
degassing_timeDays an XLPE MV or HV core needs in the oven before its sheath (Fick diffusion, published coefficients): a band, not a standard's result; the AEIC CS8-20 wait beside it up to 46 kV. $5.00 USDC per calculation (x402), no free allowance. Notes: thecablecode://guide/degassing_time.
Tool call template
This tool declares no required parameters. Add optional parameters from the input schema as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {},
"name": "degassing_time"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| lang | No | Answer language; default en. | |
| spec | No | Or a design_cable spec. | |
| input | No | input: {tempC? (default 70), target? (share left, default 0.1), calibration?, ...} | |
| items | No | Or a list of {sentence | spec | design, input}, paid per item. | |
| design | No | Or a design_cable design. | |
| sentence | No | The cable, as design_cable takes it. |